Southtowns Record

Town Board Regular Meeting Agenda, Mar 23, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Mar 23, 2026
Kind
Agenda
Topics
Zoning and land use, Water, sewer and drainage, Parks and recreation, Budget and taxes, Public safety, Roads and traffic

Original document

Same meeting

Text · page 35 of 79

Read the whole document on one page (all 79 pages, each with its own heading)

v. Is the project site subject to an institutional control limiting property uses?  9 Yes 9 No
  • If yes, DEC site ID number: ____________________________________________________________________________
  • Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________
  • Describe any use limitations: ___________________________________________________________________________
  • Describe any engineering controls: _______________________________________________________________________
  • Will the project affect the institutional or engineering controls in place?  9 Yes 9 No
  • Explain: ____________________________________________________________________________________________
  ___________________________________________________________________________________________________
  ___________________________________________________________________________________________________

E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site?  ________________ feet
b. Are there bedrock outcroppings on the project site?  9 Yes 9 No
If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________%
c. Predominant soil type(s) present on project site:  ___________________________  __________%
  ___________________________  __________%
  ____________________________  __________%
d. What is the average depth to the water table on the project site? Average: _________ feet

e. Drainage status of project site soils: 9 Well Drained:  _____% of site
  9 Moderately Well Drained:  _____% of site
  9 Poorly Drained  _____% of site
f. Approximate proportion of proposed action site with slopes: 9 0-10%:  _____% of site
  9 10-15%:  _____% of site
  9 15% or greater:  _____% of site
g. Are there any unique geologic features on the project site?  9 Yes 9 No
 If Yes, describe: _____________________________________________________________________________________________
  ________________________________________________________________________________________________________
h. Surface water features.
  i. Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers,  9 Yes 9 No
  ponds or lakes)?
 ii. Do any wetlands or other waterbodies adjoin the project site?  9 Yes 9 No
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal,  9 Yes 9 No
  state or local agency?
 iv. For each identified regulated wetland and waterbody on the project site, provide the following information:
  • Streams:  Name ____________________________________________ Classification _______________________
  •  Lakes or Ponds: Name ____________________________________________ Classification _______________________
  • Wetlands:  Name ____________________________________________ Approximate Size ___________________
  • Wetland No. (if regulated by DEC) _____________________________
v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired  9 Yes 9 No
  waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________
___________________________________________________________________________________________________________
i. Is the project site in a designated Floodway?  9 Yes 9 No
j. Is the project site in the 100-year Floodplain?  9 Yes 9 No
k. Is the project site in the 500-year Floodplain?  9 Yes 9 No
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? 9 Yes 9 No
If Yes:
  i. Name of aquifer: _________________________________________________________________________________________

  Page 11 of 13

  35