Southtowns Record

SUPPORTING DOCUMENTS-1

Government
Town of Aurora
Board
Town Board
Meeting
Feb 9, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Public safety, Energy and data center siting, Budget and taxes, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 12 of 36

Read the whole document on one page (all 36 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

A.  All applications for building permits shall be accompanied by a site plan as approved by the Town
  Board, based on the review and recommendations of the Town Planning Board and, if
  appropriate, the Town’s Engineer, Highway Superintendent and/or Code Enforcement Officer and
  upon the opinions and concerns brought up at a required public hearing(s), if any.
  B.  An approved site plan need not accompany an application for a building permit to construct any
  of the following:
  1.  A one-family or two-family dwelling and its permitted accessory uses or structures.
  2.  Acommercial improvement, either in the form of an addition to an existing structure or
  the construction of a new structure, which upon completion, will be less than 2,500
  square feet. Notwithstanding this exception, if.an applicant, during any three-year
  period, has engaged in a series of small improvements on his, her, or its property which,
  in the opinion of the Code Enforcement Officer, are intended to circumvent the
  requirements for a site plan review, Code Enforcement Officer may, in his or her
  reasonable judgement view all of those improvements in the aggregate in determining
  whether or not any such improvement or improvements would be excluded from the
  requirement of a site plan because of the amount of improved square footage involved.
  3.  Improvements on agricultural properties or farms within the Town of Aurora which
  would either not otherwise be subject to the issuance of a building permit or which are
  located in the rear of existing improvements, provided that such improvements are
  located on a parcel of land of 10 acres or more.  .
  4. Construction for the purposes of accessibility.
  C.  Notwithstanding any other provision contained in this §95-2, a site plan review will be required
  for any commercial improvement constructed ona property which immediately adjoins or is
  directly across the street from or is within 500’ of a property which is zoned residential by the
  Town

95-3 Review Procedures

  A.  Upon applying for a building permit which requires:a site plan review, the Code Enforcemen
  t
  Officer will advise the applicant of the specific materials which need to be submitted to the
  Planning Board and/or Town Board for review. This step is designed to save the applicant
  from possible future delays. The Code Enforcement Officer will review the basic site design
  concept and advise the applicant as to potential problems and concerns and will assist the
  applicant in determining the information needed to begin a preliminary site plan review. In
  order to accomplish these objectives, the applicant shall provide sketches of the proposed
  development, together with an area map showing the location of the site in relation to
  neighboring points of interest.
  B.  At this time, the Town’s designated state environmental quality review (SEQR) officer will
  decide if an environmental review is necessary.
  C.  All materials needed for a site plan review will be filed with the Code Enforcement Officer,
  together with a completed site plan review application to be developed by and obtained
  from the Code Enforcement Officer. A nonrefundable fee, the exact amount of which will be