Southtowns Record

SUPPORTING DOCUMENTS-1

Government
Town of Aurora
Board
Town Board
Meeting
Feb 9, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Public safety, Energy and data center siting, Budget and taxes, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 14 of 36

Read the whole document on one page (all 36 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

for the applicant to understand the basis for such determination, the criteria used by the
  Twon Board and others in the determination of disapproval.
  K,  Upon approval by the Town Board, a complete final site plan review package will be sent to
  the Code Enforcement Officer after which a building permit will be issued to the applicant if
  he, she, or it complies with all other applicable rules and regulations.
  L.  All costs incurred by the Planning Board and/or Town Board or other individuals involved in
  the site plan review for consultation fees or other expenses in connection with the review
  procedure shall be charged to and paid by the applicant, in the Town’s discretion either
  before or after they are incurred.

95-4 Submission requirements.

  A.  The site plan submittal checklist will assist in providing the Town's Planning Board with a
  basis for reaching a final decision regarding the recommendation ofa final site plan to the
  Town Board for approval, disapproval or approval with modifications, An applicant’s
  proposed site plan and all supporting data will be submitted by and bear the official and
  signature of a licensed architect, landscape architect, professional engineer or land surveyor.
  B.  Sit plan components, as allowed or required by state law, which will, to the extent deemed
  appropriate, be considered by the Town Board, Planning Board and others as part of an
  analysis of an applicant’s site plan will include the following: legal data, impact on the
  environs, natural features, existing man-made features, proposed development, impact
  on
  stormwater pollution and other information or materials. If a stormwater pollution
  prevention plan (SWPPP) is submitted pursuant to §95-4B(6) of this chapter, such SWPPP
  shall be considered by the Town Board, Planning Board and others as part of an analysis of
  an applicant’s site plan, and the site plan and SWPPP shall not be approved unless they
  comply  with the performance and design criteria and standards in Chapter 96, Stormwater
  Management, of the Code.
  1.  Legal data
  a,  The name, address, email and phone number of the applicant and
  authorization of the owner if different from the applicant; the name and
  address of the owner(s) of record, if different from the applicant; and the
  name, address, email and phone number of the person or firm preparing the
  site plan and any related maps or sketches.
  b,  Ownership intentions of the applicant others, such as future options, rights-
  of-way etc.
  c.  Current zoning classification of the:property, including exact zoning
  boundary if in more than one district.
  d.  Property boundary lines plotted to scale by a licensed surveyor, including
  distances, angles, North arrow, scale and date.
  e.  The locations, widths, elevations, and names of existing and proposed
  adjacent streets,