Text · page 14 of 36
Read the whole document on one page (all 36 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
for the applicant to understand the basis for such determination, the criteria used by the Twon Board and others in the determination of disapproval. K, Upon approval by the Town Board, a complete final site plan review package will be sent to the Code Enforcement Officer after which a building permit will be issued to the applicant if he, she, or it complies with all other applicable rules and regulations. L. All costs incurred by the Planning Board and/or Town Board or other individuals involved in the site plan review for consultation fees or other expenses in connection with the review procedure shall be charged to and paid by the applicant, in the Town’s discretion either before or after they are incurred. 95-4 Submission requirements. A. The site plan submittal checklist will assist in providing the Town's Planning Board with a basis for reaching a final decision regarding the recommendation ofa final site plan to the Town Board for approval, disapproval or approval with modifications, An applicant’s proposed site plan and all supporting data will be submitted by and bear the official and signature of a licensed architect, landscape architect, professional engineer or land surveyor. B. Sit plan components, as allowed or required by state law, which will, to the extent deemed appropriate, be considered by the Town Board, Planning Board and others as part of an analysis of an applicant’s site plan will include the following: legal data, impact on the environs, natural features, existing man-made features, proposed development, impact on stormwater pollution and other information or materials. If a stormwater pollution prevention plan (SWPPP) is submitted pursuant to §95-4B(6) of this chapter, such SWPPP shall be considered by the Town Board, Planning Board and others as part of an analysis of an applicant’s site plan, and the site plan and SWPPP shall not be approved unless they comply with the performance and design criteria and standards in Chapter 96, Stormwater Management, of the Code. 1. Legal data a, The name, address, email and phone number of the applicant and authorization of the owner if different from the applicant; the name and address of the owner(s) of record, if different from the applicant; and the name, address, email and phone number of the person or firm preparing the site plan and any related maps or sketches. b, Ownership intentions of the applicant others, such as future options, rights- of-way etc. c. Current zoning classification of the:property, including exact zoning boundary if in more than one district. d. Property boundary lines plotted to scale by a licensed surveyor, including distances, angles, North arrow, scale and date. e. The locations, widths, elevations, and names of existing and proposed adjacent streets,