Southtowns Record

SUPPORTING DOCUMENTS-1

Government
Town of Aurora
Board
Town Board
Meeting
Feb 9, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Public safety, Energy and data center siting, Budget and taxes, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 21 of 36

Read the whole document on one page (all 36 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

5. Is the proposed action,
  a. A pertnitied use under the zoning regulations?  N/A

  mA
  5
  b. Consistent with the adopted comprehensive plan?

  Keo
6, Is the proposed action consistent with the predominant character of the existing built or
  natural
  landscape?
 7, Is the site of the proposed action locuted in, or does it adjoin, a state listed Critical
  Environmental Arca?
If Yes, identify:

  LJ]
8. a, Will the proposed action result in a substantial increase in traffic above present levels?

  4)
  b, Are public transportation service(s) available at or near the site of the proposed action?

  ¢. Are any pedestrian accommodations or bicycle routes available on or near site of
  the proposed action?
9. Does the proposed action meet or exceed the state energy code requirements?
If the proposed action “ ‘a requirements, describe design features and technologi

  LA |e El Is
  es:

  DY 8 ES
10, Will the proposed action connect to an existing public/private water supply?

  If No, describe method for providing potable water:  N | K&

  ee SERI
11. Will the proposed action connect to existing wastewater utilities?

  If No, describe method for providing wastewater treatment:
  M { fe

  im
12, a, Does the site contain a structure that is listed on either the State or
  National Register of Historic
  Places?
  b, Is the proposed action located in'an archeological sensitive area?

13, a, Does any portion of the site of the proposed action, or lands adjoining
  the proposed action, contain
  wetlands or other waterbodies regulated by a federal, state or local agency?
  b. Would the proposed action physically alter, or encroach into, any existing

  oOo
  wetland or waterbody?
If Yes, identify the wetland or waterbody and extent of alterations i
  h square feet or acres;

14, Identify the typical habitat types that occur o n, or are likely to be found
  on the project site, Check all that apply:
  Shoreline  [Forest  Dl Agricutturai/grasslands  C]Batly mid-successional
  [J] Wetland  Curban  {suburban
15. Does the site of the proposed action contain any specics of animal,
  or associated habitats, listed
  by the State or Federal government as threatened or endangered?
  PIEelees

16. Is the project site located in the 100 year flood plain?
  ql

 17, Will the proposed action create storm water discharge, either from
  point or non-point sources?  YES
Tf Yes,  .
  a, Will storen water discharges flow to adjacent properties?
  LJ] No  Lves  J
  b, Will storm water discharges be directed to established conveyance systems
If Yes, briefly describe:
  (tunoff and storm drains)?
  No.  [ves

  Page 2 of 3