Southtowns Record

SUPPORTING DOCUMENTS-1

Government
Town of Aurora
Board
Town Board
Meeting
Feb 9, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Public safety, Energy and data center siting, Budget and taxes, Parks and recreation, Roads and traffic

Original document

Same meeting

Text · page 7 of 36

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

CSD
  tga  1

Solar Energy Systems Chapter 954

95A-AC: Utility-scale solar energy systems are only permitted in C-1, C-2, and C-3 zoning districts.

95A-5E: Utility-scale solar energy systems and all solar energy systems over 25 kw shall be subject to all
provisions of this chapter and permitted only in the approved districts (C-1, C-2, and C-3) zoning districts.
These systems shall require a special use permit , site plan approval from the Town Board and a building
permit from the Town of Aurora Building Department.

95A-6C(5): The total surface area of a non-utility-scale said solar energy system on a lot situated in an
Agriculture (A) and Commercial (C1, C2, and C3) District shall not exceed 5% of the total square footage
of the entire lot.

95A-6C(6): The total surface area of a utility-scale solar energy system on a fot which is greater than two
acres situated in Commercial (C1, C2, and C3) District shall not exceed 10% of the total square footage of
the entire lot.

95A-8B{2): As regulated for accessory structures in the Commercial (C1, C2, and C3) uses in
Chapter 116 of the Town Code.

Subdivision of Land and ODA Chapter 99

Add 99-6B: Prior to submittal of an application, a preliminary meeting with the developer, property
owner, Town Supervisor, Superintendent of Highways, and Code Enforcement Officer is required to
discuss the proposed subdivision. This meeting will review the basic site design concept and advise the
developer as to potential problems or concerns and will assist the developer in determining the
information required to begin the process. [move all subsequent sections down one]

99-31A(5}): Front Yard Setback

  A.  200 feet from the boundary line parallel to the street right-of-way
  B.  No accessory building/structure shall be erected in the front yard.

Zoning Chapter 116

116-4 Building, Height of: The vertical distance measured from the average elevation of the proposed
finished grade at the front of the building to the highest point of the roof for flat roofs, to the deck line
of mansard roofs and to the mean height between eaves and ridge for gable, shed, hip and gambrel
roofs.

Delete 116-8.5D(3}

Delete 116-8.5E(3)