Text · page 36 of 39
Read the whole document on one page (all 39 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
14, Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply: [shoreline [[] Forest [¥] Agricultural/grasslands Early mid-successional (C)Wetland [[) Urban [7] Suburban 15, Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or Federal government as threatened or endangered? O : L] : N46 16. Is the project site located in the 100-year flood plan? 17. Will the proposed action create storm water discharge, either from point or non-point sources? ES rg If Yes, MNO) NOW a. Will storm water discharges flow to adjacent properties? b. Will storm water discharges be directed to established convey: ance systems (runoff and storm drains)? If Yes, briefly describe: Following on-site storm detention, stormwater will ultimately flow into the NYSDOT storm system along the north side of NYS RL20A, f 18. Does the proposed action include construction or other activities that would result in the impoundmen t of water YES or other liquids (¢.g., retention pond, waste lagoon, dam)? If'Yes, explain the purpose and size of the impoundment: LI 19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste | NO | YES management facility? If Yes, describe: _ LI 20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or NO | YES completed) for hazardous waste? If Yes, describe: [CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/s or/name; Carner Development Group Inc. Date: 2.18.2026 sighAIL, os, Title; President a) = a PRINT FORM Page 3 of 3