Text · page 2 of 39
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
2. Impact on Geological Features The proposed action may result in the modification or destruction of, or inhibit access to, any unique or unusual land forms on the site (e.g., cliffs, dunes, VINO LIYEs minerals, fossils, caves). (See Part 1. E.2.g) If “Yes”, answer questions a-c. If “No”, move on to Section 3. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. Identify the specific land form(s) attached: E2g a) ia) b. The proposed action may affect or is adjacent to a geological feature listed as a E3e Qo Qa registered National Natural Landmark. Specific feature: c. Other impacts: oO o 3. Impacts on Surface Water The proposed action may affect one or more wetlands or other surface water INo Clyes bodies (e.g., streams, rivers, ponds or lakes), (See Part 1. D.2, E.2.h) Ff “Yes”, answer questions a - 1. If “No”, move on to Section 4. Relevant No, or Moderate Part I smal] to large Question(s) impact impact may may occur occur a, The proposed action may create a new water body. D2b, Dih ial a b. The proposed action may result in an increase or decrease of over 10% or more than a | D2> ao 4 10 acre increase or decrease in the surface area of any body of water, ¢, The proposed action may involve dredging more than 100 cubic yards of material D2a a a from a wetland or water body. d. The proposed action may involve construction within or adjoining a freshwater or E2h fa o tidal wetland, or in the bed or banks of any other water body. e. The proposed action may create turbidity in a waterbody, either from upland erosion, | D2a, D2h qa ia) runoff or by disturbing bottom sediments. f, The proposed action may include construction of one or more intake(s) for withdrawal | D2c a a of water from surface water. g. The proposed action may include construction of one or more outfall(s) for discharge | D2d Qa a of wastewater to surface water(s). h. The proposed action may cause soil erosion, or otherwise create a source of D2e q a stormwater discharge that may lead to siltation or other degradation of receiving water bodies. i, The proposed action may affect the water quality of any water bodies within or E2h a qa downstream of the site of the proposed action. j. The proposed action may involve the application of pesticides or herbicides in or D2q, E2h a aq around any water body. k. The proposed action may require the construction of new, or expansion of existing, Dia, D2d im a wastewater treatment facilities. Page 2 of 10