Text · page 3 of 39
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
1, Other impacts: 4. Impact on groundwater The proposed action may result in new or additional use of ground water, or VINO Clves may have the potential to introduce contaminants to ground water or an aquifer, (See Part 1. D.2,a, D.2.¢, D.2.d, D.2.p, D.2.q, D.2.) If “Yes”, answer questions a-h, If “No”, move on to Section 5. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may require new water supply wells, or create additional demand | D2c oO in) on supplies from existing water supply wells. b. Water supply demand from the proposed action may exceed safe and sustainable D2c a oO withdrawal capacity rate of the local supply or aquifer. Cite Source: ¢, The proposed action may allow or result in residential uses in areas without water and | Dla, D2c a Q sewer services. d, The proposed action may include or require wastewater discharged to groundwater. D2d, E21 5 4 e. The proposed action may result in the construction of water supply wells in locations | D2c, E1f, a Qo where groundwater is, or is suspected to be, contaminated. Elg, Elh f. The proposed action may require the bulk storage of petroleum or chemical products | D2p, E21 oa o over ground water or an aquifer, g. The proposed action may involve the commercial application of pesticides within 100 | E2h, D2q, Oo Q feet of potable drinking water or irrigation sources. E21, Dac h. Other impacts: a o 5. Impact on Flooding The proposed action may result in development on lands subject to flooding. NO ClvEs (See Part 1. B.2) Uf “Yes”, answer questions a-g. If “No”, move on to Section 6. Relevant No, or Moderate Part I small to large Question(s) impact impact may may occur occur a. The proposed action may result in development in a designated floodway. E2i Qo ia) b, The proposed action may result in development within a 100 year floodplain. E2j im] ia) c, The proposed action may result in development within a 500 year floodplain. E2k O o d. The proposed action may result in, or require, modification of existing drainage D2b, D2e qo oO patterns. e. The proposed action may change flood water flows that contribute to flooding. D2b, E2i, a in} E2j, E2k f, If there is a dam located on the site of the proposed action, is the dam in need of repair, | Ele o a or upgrade? Page 3 of 10