Southtowns Record

SUPPORTING DOCUMENTS-2

Government
Town of Aurora
Board
Town Board
Meeting
Mar 23, 2026
Kind
Agenda packet
Topics
Zoning and land use, Budget and taxes, Water, sewer and drainage, Parks and recreation, Public safety

Original document

Same meeting

Text · page 3 of 39

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

1, Other impacts:

4.  Impact on groundwater
  The proposed action may result in new or additional use of ground water, or  VINO  Clves
  may have the potential to introduce contaminants to ground water or an aquifer,
  (See Part 1. D.2,a, D.2.¢, D.2.d, D.2.p, D.2.q, D.2.)
  If “Yes”, answer questions a-h,  If “No”, move on to Section 5.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action may require new water supply wells, or create additional demand | D2c  oO  in)
  on supplies from existing water supply wells.

b. Water supply demand from the proposed action may exceed safe and sustainable  D2c  a  oO
  withdrawal capacity rate of the local supply or aquifer.
  Cite Source:

¢, The proposed action may allow or result in residential uses in areas without water and  | Dla, D2c  a  Q
  sewer services.

d, The proposed action may include or require wastewater discharged to groundwater.  D2d, E21  5  4

e. The proposed action may result in the construction of water supply wells in locations  | D2c, E1f,  a  Qo
  where groundwater is, or is suspected to be, contaminated.  Elg, Elh

f. The proposed action may require the bulk storage of petroleum or chemical products  | D2p, E21  oa  o
  over ground water or an aquifer,

g. The proposed action may involve the commercial application of pesticides within 100 | E2h, D2q,  Oo  Q
  feet of potable drinking water or irrigation sources.  E21, Dac

h. Other impacts:  a  o

5.  Impact on Flooding
  The proposed action may result in development on lands subject to flooding.  NO  ClvEs
  (See Part 1. B.2)
  Uf “Yes”, answer questions a-g. If “No”, move on to Section 6.
  Relevant  No, or  Moderate
  Part I  small  to large
  Question(s)  impact  impact may
  may occur  occur
a. The proposed action may result in development in a designated floodway.  E2i  Qo  ia)
b, The proposed action may result in development within a 100 year floodplain.  E2j  im]  ia)

c, The proposed action may result in development within a 500 year floodplain.  E2k  O  o

d. The proposed action may result in, or require, modification of existing drainage  D2b, D2e  qo  oO
  patterns.

e. The proposed action may change flood water flows that contribute to flooding.  D2b, E2i,  a  in}
  E2j, E2k
f, If there is a dam located on the site of the proposed action, is the dam in need of repair,  | Ele  o  a
  or upgrade?
  Page 3 of 10