Text · page 5 of 71
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Agency Use Only [If applicable] Project:| Chapt 35 Alarm Sys Date: 14/7/26 Short Environmental Assessment Form Part 3 Determination of Significance For every question in Part 2 that was answered “moderate to large impact may occur’, or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact, please complete Part 3. Part 3 should, in sufficient detail, identify the impact, including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant. Each potential impact should be assessed considering its setting, probability of occurring, duration, irreversibility, geographic scope and magnitude. Also consider the potential for short- term, long-term and cumulative impacts. The updates to Chapter 35 Alarm Systems of the Code of the Town of Aurora are primarily clerical in nature and have no impact on the environment. [| Check this box if you have determined, based on the information and analysis above, and any supporting documentation, that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required. Check this box if you have determined, based on the information and analysis above, and any supporting documentation, that the proposed action will not result in any significant adverse environmental impacts. Town of Aurora Name of Lead Agency Date Charles D. Snyder Supervisor Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer CExabeth Signature of Responsible Officer in Lead Agency SignQrire of Preparer (if differht from Responsible Officer) PRINT FORM Page 2 of 2