Text · page 15 of 41
Read the whole document on one page (all 41 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
FORMERLY FOIT-A ERT ASSOCIATES LB RE: Brooklea Drive over Tannery Brook PIN 5765.46 Progress Report No. 11: January 1, 2025 through April 24, 2026 Achievements e Updated all sections of the DAD. e Addressed environmental comments. .¢ Forwarded and verified the preliminary design parameters. Scheduled Statement e The project is on schedule Budget Statement e On Budget. Planned For Next Month e Finalize the draft DAD e Prepare for a Public Info meeting Items Required © e Nothing at this time. Very truly yours, Gerard J. Sentz, P.E. Vice President Foit-Albert Associates Burfela 295 Main Street, Suite 200 / Buffalo, WY 203) 716.856.3933 Albany 435 New Karner Road / Albary, NY 12205 / 518.452.1037 ithaca 123 W. State Street, Suite 201/ Ithaca, NY 14850 /607.288.2088 Manhattan, 215 West 94th Street, Suite S17 / New York, N¥ 10025 / 212.372.4813 Queens 89-31 16lat Street, Suite 901 / Jamaica, NY 11432 / 718.374.5422 Philadelphia 123 S. Broad Street / 18th Floor / Philadelphia, PA 19109