Text · page 40 of 41
Read the whole document on one page (all 41 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Caller Name/Address Date/Phone Notes Closed Nick 04-22-26 Check sump pump operation and discharge of 04-28-26. Highway Garage highway lift. Hans and Mike. | Anthony for Pioneer Mfg 04-22-26 One skid 935 pieces) is being délivered on 4/23/26. Highway Bullding (716)681-6155 between 7AM-12PM. They will call half hour before they come. They will need someone-to unload. ' This is for the Arsenals. Dave. 04-22-26 Clean all bathrooms. Jason-1 hour 04-22-26 highway buildings ; Luke 04-22-26 Clean ceiling filter in village bathroom. It is on the 04-27-26 ceiling. Mike | Village Hall Luke 04-22-26 Clean entrance doors. 04-24-26 Village Hall Jeanne scheduled a window cleaning for 4/24/26. Done Maria Pitt | 04-24-26 Rernove the two long flower boxes from front of Senior 04-28-26 Genter. Senior Center Nick and Hans Donna 04-27-26 Please clean outside dryer vent. 04-16-26 Mike |, Nick Senior Center Liz 04-29-26 Please check expiration dates on all pads and battery Town Hall packs in the AED machines.at Town Hail. Liz per Agri Markets Meeting 04-29-26 Isolation Kennel construction: Highway Office 1 4'x8' kennel Use epoxy on floor Keep PPE gear in plastic.tote outside the room-need to buy tote separate Mop and bucket-ordered 4/29 4 door is okay Liz per Agri Matket 04-28-26 Before 6/16/26: Parks Garage Install guillotine door Seal floor Put aggressive dog sign up on kennel Can put boards on outside walls, recommends sealing the top part of kennel. needsto be kept clean. lightly clean/dust once a week. disinfect.and clean whenever an animal is in.. Liz-Per Agri Market 04-29-26 * Put lid on garbage can that sits next to kennel-lid Parks Garage must be on at all times * Adhere handwashing sign to wall next to sink Total count: Building Department Work Requi 23 Page 2 08-01-26