Text · page 9 of 41
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
@ co. FORMERLY FOIT-ALBERT ASSOCIATES RE: East Fillmore Over Tannery Brook PIN 5763.88 Progress Report No. 25: January 31, 2026 through April 24, 2026 Achievements ¢ Continued to coordinate on the Flood Encroachment Study report Scheduled Statement e The bridge is open. No construction is to be done Budget Statement e We are under budget Pianned For Next Month ¢ Finish Flood Encroachment Study report coordination Items Required e Nothing at this time Very truly yours, Gerard J. Sentz, P.E. Vice President Foit-Albert Associates Architecture. ALBANY BUFFALO NYC ingineering, 295 Main Street, Suite 200 Buffalo, New York 14203 8 716.956.3933 #4 716.956.3961 © wwwfoit-albertcom Surveying. Environmental,