4.0 CONSTRUCTION SEQUENCE This project has not received written approval from the Town of West Seneca allowing the disturbance of more than five acres of land at any one time. Therefore, if the Contractor’s construction sequence requires the disturbance of more than five acres at any one time, written approval must be obtained from written approval from the Town of West Seneca prior to disturbing more than five acres at once. The “Erosion and Sediment Control Plan” and the “Erosion and Sediment Control Plan Prior to Construction” in the accompanying drawings and waiver request identifies the major construction activities that are the subject of this SWPPP. The order (or sequence) in which the major activities are expected to begin is presented on the accompanying drawings, though each activity will not necessarily be completed before the next begins. In addition, these activities could occur in a different order if necessary to maintain adequate erosion and sediment control. If this is the case, the contractor shall notify the Owner’s/Operator’s Engineer overseeing the implementation of the SWPPP. The Contractor will be responsible for implementing the erosion and sediment control measures identified on the plans. The Contractor may designate these tasks to certain subcontractors as they see fit, but the ultimate responsibility for implementing these controls and ensuring their proper function remains with the Contractor. In accordance with Part III.B.c.iv. a phasing plan for the project and sequencing plans for all phases have been provided. The plans address clearing and grubbing, excavation and grading, utility and infrastructure installation, final stabilization, and any other construction activity at the site that will result in soil disturbance. Refer to the plans for further information on the project phasing and sequencing. 5.0 CONSTRUCTION-PHASE POLLUTION CONTROL The SWPPP and accompanying plans identify the temporary and permanent erosion and sediment control measures that have been incorporated into the design of this project. These measures will be implemented during construction, to minimize soil erosion and control sediment transport off-site, and after construction, to control the quality and quantity of stormwater runoff from the developed site. Erosion control measures, designed to minimize soil loss, and sediment control measures, intended to retain eroded soil and prevent it from reaching water bodies or adjoining properties, have been developed in accordance with the following documents: • NYSDEC SPDES General Permit for Stormwater Discharges From Construction Activity, Permit No. GP-0-25-001 (effective January 29, 2025 through January 28, 2030) • New York State Standards and Specifications for Erosion and Sediment Control, NYSDEC (November 2016) The SWPPP and accompanying plans outline the construction scheduling for implementing the erosion and sediment control measures. These documents include limitations on the duration of soil exposure, criteria and specifications for placement and installation of the erosion and sediment control measures, a maintenance schedule, and specifications for the implementation of erosion and sediment control practices and procedures. Temporary and permanent erosion and sediment control measures that shall be applied during construction generally include: Stormwater Pollution Prevention Plan Page 14 2241067 Page 101 of 359