6.1.3  Temporary Suspension of Construction Activities

 For construction sites where soil disturbance activities have been temporarily suspended (e.g. Winter
 shutdown) and temporary stabilization measures have been applied to all disturbed areas, the
 frequency of Qualified Inspector/Qualified Professional inspections can be reduced to once every 30
 calendar days. Prior to reducing the frequency of inspections, the Owner/Operator shall notify the
 NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.

 6.1.4  Partial Project Completion

 For construction sites where soil disturbance activities have been shut down with partial project
 completion, all areas disturbed as of the project shutdown date have achieved final stabilization, and
 all post-construction stormwater management practices required for the completed portion of the
 project have been constructed in conformance with the SWPPP and are operational, the inspections
 by the Qualified Inspector/Qualified Professional can stop. Prior to the shutdown, the Owner/Operator
 shall notify the NYSDEC Region 9 stormwater contact person and the Town of West Seneca in writing.

 If soil disturbance activities have not resumed within two years from the date of shutdown, a Notice of
 Termination (NOT) shall be properly completed and submitted to the NYSDEC.

 6.1.5  Post-Construction Inspections and Maintenance

 Inspections and maintenance of final stabilization measures and post-construction stormwater
 management practices shall be performed in accordance with Appendix G, once all disturbed areas
 are stabilized and all stormwater management systems are in place and operable.

 6.2 Reporting Requirements

 6.2.1  Inspection Reports

 Pursuant to Part IV.C of GP-0-25-001, inspection reports shall be prepared for the duration of
 construction, as outlined herein, and shall be signed by the Qualified Inspector or Qualified
 Professional. A sample inspection form is provided in Appendix F.

 At a minimum, each inspection report shall record the following information:
  1. Permit identification number; and
  2. Date and time of inspection; and
  3. Name and title of person(s) performing inspection; and
  4. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of the
  inspection, including the temperature at the time of the inspection; and
  5. A description of the condition of the runoff at all points of discharge from the construction site.
  This must include identification of any discharges of sediment from the construction site.
  Include discharges from conveyance systems (i.e. pipes, culverts, ditches, etc.) and overland
  flow; and
  6. A description of the condition of all surface waters of the State located within, or immediately
  adjacent to, the property boundaries of the construction site which receive runoff from
  disturbed areas. This must include identification of any discharges of sediment to the surface
  waters of the State; and

Stormwater Pollution Prevention Plan
  Page 24