contractor(s) and subcontractor(s) that will be responsible for constructing the SMPs included
  in the SWPPP. Each of the contractors and subcontractors must identify at least one person
  from their company to be the trained contractor that will be responsible for implementation of
  the SWPPP. Ensure that at least one trained contractor is on site daily when soil disturbance
  activities are being performed.

  9. Schedule a pre-construction meeting which shall include the Town of West Seneca
  representative, Owner’s/Operator’s Engineer, Qualified Inspector, Contractor, and their sub-
  contractors to discuss responsibilities as they relate to the implementation of this SWPPP.

  10. Retain the services of an independent certified materials testing and inspection firm operating
  under the direction of a licensed Professional Engineer to perform regular tests, inspections,
  and certifications of the construction materials used in the construction of all post-construction
  stormwater management practices.

  11. Retain the services of a NYS licensed land surveyor to perform an as-built topographic survey
  of the completed post-construction stormwater management facilities.

  12. Require the Contractor to fully implement the SWPPP prepared for the site by the
  Owner/Operator’s Engineer to ensure that the provisions of the SWPPP are implemented from
  the commencement of construction activity until all areas of disturbance have achieved final
  stabilization and the Notice of Termination (NOT) has been submitted to the NYSDEC.

  13. The Owner/Operator is authorized to commence construction activity as of the authorization
  date indicated in the Letter of Authorization (LOA), which is sent by NYSDEC after a complete
  eNOI is submitted.

  14. Within five (5) business days of receipt of the LOA, send an electronic copy of the LOA to the
  MS4 operator(s) with review authority.

  15. Forward a copy of the LOA received from DEC to the Owner’s/Operator’s Engineer for project
  records, and to the Contractor for display at the construction site.

  16. As of the date the LOA is received, the Owner/Operator must make the eNOI, SWPPP and LOA
  available for review and copying in accordance with the requirements in Part VII.H. of GP-0-25-
  001. When applicable, as of the date an updated LOA is received, the Owner/Operator must
  make the updated LOA available for review and copying in accordance with the requirements
  in Part VII.H.

  17. The Owner/Operator must ensure compliance with all requirements of GP-0-25-001 and that
  the provisions of the SWPPP, including any changes made to the SWPPP in accordance with
  Part III.A.5., are properly implemented and maintained from the commencement of
  construction activity until all area of disturbance have achieved final stabilization; and the
  Owner/Operator’s coverage under the permit is terminated in accordance with Part V.A.5.a.

  18. As of the date of the commencement of construction activities until Part I.E.2.a. and b. have
  been met, the Owner/Operator must maintain at the construction site, a copy of all
  documentation necessary to demonstrate eligibility with GP-0-25-001, a copy of GP-0-25-001,
  the SWPPP, the signed SWPPP Preparer Certification Form, the signed MS4 SWPPP
  Acceptance Form, signed Owner/Operator Certification Form, eNOI, and LOA, and LOA
  transmittal to the MS4 Operator in accordance with Part I.D.3.c.