6. Update the SWPPP each time there is a significant modification to the pollution prevention measures or a change of the principal Contractor working on the project who may disturb site soil. 7.3 Contractor's Responsibilities 1. Sign the SWPPP Contractor's Certification Form contained within Appendix B and forward to the Owner’s/Operator’s Engineer for inclusion in the Site Log Book. 2. Identify at least one Trained Contractor that will be responsible for implementation of this SWPPP. Ensure that at least one Trained Contractor is on site on a daily basis when soil disturbance activities are being performed. The Trained Contractor shall inspect the erosion and sediment control practices and pollution prevention measures being implemented within the active work area daily to ensure that they are being maintained in effective operating conditions at all times. For corrective actions not requiring engineering design, the contractor must begin implementing corrective actions within one business day and complete the corrective actions within five business days. For corrective actions requiring engineering design, the engineering design process must begin within five business days and the contractor must complete the corrective action in a reasonable time frame but no later than 60 calendar days. 3. Provide the names and addresses of all subcontractors working on the project site. Require all subcontractors who will be involved with construction activities that will result in soil disturbance to identify at least one Trained Contractor that will be on site on a daily basis when soil disturbance activities are being performed; and to sign a copy of the Subcontractor’s Certification Form contained within Appendix B, then forward to the Owner’s/Operator’s Engineer for inclusion into the Site Log Book. This information must be retained as part of the Site Log Book. 4. Maintain a Spill Prevention and Response Plan in accordance with requirements outlined in Section 5 of this SWPPP. This plan shall be provided to the Owner’s/Operator’s Engineer for inclusion in the Site Log Book, prior to mobilization on-site. 5. Participate in a pre-construction meeting which shall include the Town of West Seneca representative, Owner/Operator, Owner’s/Operator’s Engineer, Qualified Inspector, and all subcontractors to discuss responsibilities as they relate to the implementation of this SWPPP. 6. If Contractor plans on utilizing adjacent properties for material, waste, borrow, or equipment storage areas, or if Contractor plans to engage in industrial activity other than construction (such as operating asphalt and/or concrete plants) at the site, Contractor shall submit appropriate documentation to the Owner’s/Operator’s Engineer so that the SWPPP can be modified accordingly. 7. Implement site stabilization, erosion and sediment control measures, and other requirements of the SWPPP. 8. In accordance with the requirements in the most current version of the NYS Standards and Specifications for Erosion and Sediment Control, conduct inspections of erosion and sediment control measures installed at the site to ensure that they remain in effective operating condition at all times. Prepare and retain written documentation of inspections as well as of Stormwater Pollution Prevention Plan Page 30 2241067 Page 117 of 359