29. Submit a complete Notice of Termination form electronically using the NYSDEC eNOT. Coverage is terminated as of the termination date indicated in the Letter of Termination (LOT), which is sent by NYSDEC after a complete eNOT is submitted. 30. Request and receive all SWPPP records from the Owner’s/Operator’s Engineer and archive those records, along with the LOT, for a period of at least five (5) years from the date that NYSDEC accepts a complete NOT submitted. 31. Implement the Post-Construction Inspections and Maintenance procedures outlined in Appendix G. 32. The Owner/Operator must keep the SWPPP current so that it at all times accurately documents the erosion and sediment controls practices that are being used or will be used during construction, and all post-construction stormwater management practices that will be constructed on the site. At a minimum, the Owner/Operator shall amend the SWPPP, including construction drawings: a) Whenever the current provisions prove to be ineffective in minimizing pollutants in stormwater discharges from the project site; b) Whenever there is a change in design, construction, or operation at the construction site that has or could have an effect on the discharge of pollutants; and c) To address issues or deficiencies identified during an inspection by the “Qualified Inspector,” the Department, or other Regulatory Authority. d) To document the final construction conditions. 33. When property ownership changes or when there is a change in operational control over the construction plans and specifications, the original owner or operator must notify the new owner or operator, in writing, of the requirement to obtain permit coverage by submitting a NOI with the Department, in conformance with Part I.G.. For construction activities subject to the requirements of a regulated, traditional land use control MS4, the original owner or operator must also notify the MS4, in writing, of the change in ownership at least 30 calendar days prior to the change in ownership. 7.2 Owner’s/Operator’s Engineer’s Responsibilities 1. Prepare the SWPPP using good engineering practices, best management practices, and in compliance with all federal, state, and local regulatory requirements. 2. Prepare the electronic Notice of Intent (eNOI) (see Appendix B) and sign the “SWPPP Preparer Certification Form.” Forward the Owner/Operator Certification Form to the Owner/Operator for signature. 3. Provide copies of the SWPPP to the Town of West Seneca once all signatures and attachments are complete. 4. Enter Contractor’s information in Section 7.5 “SWPPP Participants” once a Contractor is selected by the Owner/Operator. 5. Participate in a pre-construction meeting which shall include the Town of West Seneca representative, Owner/Operator, Qualified Inspector, Contractor, and all subcontractors to discuss responsibilities as they relate to the implementation of this SWPPP. Stormwater Pollution Prevention Plan Page 29 2241067 Page 116 of 359