Text · page 26 of 74
Read the whole document on one page (all 74 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
k. Wil the proposed action (for commercial or industrial projects only) generate new or additional energy demand? [Yes |_|No If Yes: N/A- not a commercial/industrial project i, Estimate annual electricity demand during operation of the proposed action: ii. Anticipated sources/suppliers of electricity for the project (e.g., on-sile combustion, on-site renewable, via grid/local utility, or other): iff. Will the proposed action require a new, or an upgrade, to an existing substation? [lYes [No |. Hours of operation. Answer ail items which apply. i, During Construction: ii, During Operations: * Monday - Friday: _7AM-5PM e Monday - Friday: Continuous use of water system e Saturday: NIA e Saturday: Continuous use of waler syslem e Sunday: NIA e Sunday: Continuous use of water system ¢ Holidays: NIA ¢ Holidays: Continuous use of water system m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes [No operation, or both? If yes: i, Provide details including sources, time of day and duration: Ambient nolse levels would likely be exceeded during construction. Construction activities would be completed during daytime, weakday work hours (generally 7AM to 5PM). Operational noise levels at the booster pump station are not expected tc be audible from nearby developed properties. ii, Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes LINo Describe: Tree clearing may be required to facilitate construction. All clearing will be restricted to the smallest footprint required, n. Will the proposed action have outdoor lighting? [x] Yes []No If yes: i, Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures: New exterior lighting would be installed for the booster pump station upgrades. New lighting would aim downward, and would be mounted approx. 5 feet high off ihe ground. The nearest occupied structures are approximately 100 feet east and west of the proposed light. ii, Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes [No Describe: Tree clearing may be required to facilitate construction, All clearing will be restricted to the smallest footprint required. o. Does the proposed action have the potential to produce odors for more than one hour per day? [Yes KINo If Yes, describe possible sources, potential frequency and duration of odor emissions, atid proximity to nearest occupied structures: p. Will the proposed action include any bulk storage of petroleum (combined capacity of over 1,100 gallons) [lYes KINo or chemical products [85 gallons in above ground storage or any amount in underground storage? If Yes: i, Product(s) to be stored if, Volume(s) per nnit time (e.g., month, year) iii. Generally, describe the proposed storage facilities: q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (ie,, herbicides, L] YesL]No insecticides) during construction or operation? If Yes: ; Vind ; : escr} proposed treatment(s): NIA- not not a commercialfindustrial project i. Describe ii, Will the proposed action use Integrated Pest Management Practices? ' L] Yes (JNo Page 8 of 15 FEAF 2006