Text · page 27 of 74
Read the whole document on one page (all 74 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
r, Will the proposed action (commercial or industrial projects only) involve or require the management or disposal — [_]Yes[_]No
of solid waste (excluding hazardous materials)?
If Yes:‘ a
. . . see N/A- not a commerciaifindusitial project
i, Describe any solid waste(s) to be generated during construction or operation of the facility: Pro)
e §=©Construction: fons per. (unit of time)
e «Operation ; tons per (unit of time)
ii. Describe any proposals for on-sife minimization, recycling or reuse of materials to avoid disposal as solid waste:
» Construction:
« Operation:
iii. Proposed disposal methods/facilities for solid waste generated on-site:
« Construction:
e Operation:
s. Does the proposed action include construction or modification of a solid waste management facility? [1 Yes {X] No
If Yes:
i. Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or
other disposal activities):
i7, Anticipated rate of disposal/processing:
e Tons/month, if transfer or other non-combustion/thermal treatment, or
e Tons/hour, if combustion or thermal treatment
iii, Lf landfill, anticipated site life: years
t, Will the proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous [_]Yes X]No
waste?
Hf Yes:
i. Name(s) of all hazardous wastes or constituents to be generated, handled, or managed at facility:
ii, Generally describe processes or activities involving hazardous wastes ar constituents:
iti, Specify amount to be handled or generated tons/month
iv. Describe any proposals for on-site minimization, recycling, or reuse of hazardous constituents:
y. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? ClYes LINo
If Yes: provide name and location of facility:
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility:
Page 9 of 15 FEAF 2026