Text
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
40 nt thw
Submission Requirements for Town of Aurora Site Plan Review
The Applicant shall submit to the Superintendent of Building a completed Site Plan Review application as
well as 15 copies of the following documents where deemed necessary.
TAN boundary survey with site plan showing proposed lots, building locations (Proposed and existing),
land use areas, utility easements, right-of-way boundaries, North arrow, date, scale, existing wetlands
were applicable.
of Topographical Survey based on United States Geological Survey data to extend a reasonable distance
beyond proposed site. Also list any changes to current topography.
3/ Location of existing and proposed easements.
W/ Existing natural features such as watercourses, waterbodies, wetlands, wooded areas, flood hazard
areas, 15% or more slope areas. Any changes to these features are to be noted.
A Stormwater pollution prevention plan (SW PP), 7 ane an acre or more oh 7Zz € r4 \0
el Soil T- Zz characteristics, capabilites oe limitations for development according to TOA
soil district “A IM Ly pa { ticular 4
1 Location and design of all existing on-site as well as neighboring improvements including drainage,
culvert pipes, waterlines, sanitary and storm sewer systems, retaining walls and fences.
8.“ Location and design of all utilities, proposed and existing, including, but not limited to electric, gas,
water, cable, etc.
. Location and design of all proposed and existing streets, parking lots, service areas, access drives,
bicycle and pedestrian ways within and neighboring proposed site.
0 Location, height of buildings and front, side, and rear lot dimensions of all proposed buildings.
U Location of all open space designated for “Grd space”, vars playel Minds, landscape screening and
general landscape proposals.
sorts
eo
(12 ALocation, size and design of all proposed signage and outdoor lighting.
131 Building elevation drawings, when required.
af Grading and drainage plan showing existing and proposed contours at intervals not exceeding 2 feet.
Include measures, devices and or structures for erosion and runoff control during and after
construction.
ri Location of nearest fire hydrants and acc ssf for Me et LA
and their equipment. Fy WV! SL lL ving
NI U An NSBO (or Tinwwirs Vepatr ih te
16. Lan WE plan identifying plant = cals Teton offeeaseie IpSteng an outdoor storage.
Provisions for visual and noise screening.
19/ Short EAF form — see attached
19/1f not in ‘B’ district, notify abutting properties of proposed plans (Building Department will help).
19. Is approval needed by any other agency such as NYS Freshwater Wetland permit, US Army Corp of
NK Engineer and Federal Wetland impact permit for this project? If so, list the approval type and time
frame of approval.