Text · page 11 of 53
Varinder Gill states upon completion of the project there will be all new paving and striping. Chuck Norris, indicated that the intention is to hopefully start in approximately two weeks following approval. The tentative time of completion would be mid-January. Angela Griffis asks about the height of canopy. Also, would there be any change in lighting. Chuck Norris, states the canopy height will be 14 feet. The lighting for the new canopy will be updated to LED. Tim Stroth asks where the underground drainage goes. Chuck Norris, that underground drainage will not be installed. All drainage will be above ground directed to existing drainage, which takes most of the drainage. Angela Griffis makes a motion to the Planning Board to recommend to the Town Board, to approve the amendment to the existing Site Plan to include the replacement of the existing canopy and fuel pumps as proposed at 1045 Davis Road. Second by: Chelsea Root Upon a vote being taken: Ayes- 6 Noes-0 Motion carried c. Concept Plan Review discussion for 1196 Big Tree Road, SBL: 165.00-1-28.21, as submitted by Peter Sorgi, agent for owner Carner Development Group, Inc. Rachel Krawjwewski introduces herself and provides the Planning Board with a brief description of her background and Carner Development Group spaces in the town. Peter Sorgi is here representing the Carner Development Group. They are here before the Planning Board, looking for input regarding three possible options for the use of 1196 Big Tree Road. There will be no variances required. They are presently in the engineering process. The project site is zoned Rural Residential (first 300 feet) and Agricultural. All three options are allowed with Special Use Permit and Site Plan approval. No variances required.