Text · page 20 of 27
Read the whole document on one page (all 27 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Attachment 1.0 Pond & Lake Maintenance Service Agreement Including Green Lake Between Town of Orchard Park 4295 South Buffalo Street Orchard Park, NY 14127 And AquaTech Environmental, Inc. 45 Kent Avenue Blasdell, NY 14219 (716)983-6480 Service Agreement Type: Annual Service Agreement. Effective Date(s): 1/1/2026 - 12/31/2026 Scope of Work: AquaTech Environmental, Inc. agrees to provide the following services on an as needed basis for all Town owned ponds and lake: Consult with NYSDEC Fisheries Management regarding the potential for stocking grass carp. The spillway structure would require a grass carp retention device to be added to the top surface to retain the fish in the system. AquaTech Environmental, Inc. will act as liaison between the Town and NYSDEC Fisheries — Region 9 office to submit permit applications and proposed modifications to the spillway that are designed to retain the grass carp in Green Lake. If approved, AquaTech Environmental, Inc. will stock grass carp in Green Lake (SEE BELOW). Additional forage fish and game fish will also be added to Green Lake. (ATTACHMENT 3.0 FISHERY MANAGEMEN T AGREEMENT) Conduct as needed assessments and management recommendations for all Town owned ponds and lakes to support proper maintenance and overall waterbody health. Cost: Grass Carp Ifthe permit is approved by the NYSDEC, the stocking cost for grass carp/fish stocking described above and in attachment 3.1 will be $9,947.00. If the grass carp stocking is determined to be not permittable, the allotted $9,426.75 could be utilized for forage and/or gamefish stocking in Green Lake or other Town ponds/lake per attachment 3.2. Town of Orchard Park has allocated $2,000.00 toward water quality treatment in 2026. Additional Services/Materials: If additional services or materials, not included in the Scope of Work section above are required, a separate written addendum will be requested and added to this Annual Service Agreement. This would include materials needed for modification of the spillway for grass carp retention.