Part IV.C.1.a. not located in one of the watersheds listed in Appendix C and not directly discharging to one of the 303(d) segments listed in Appendix D; and b. the construction of a single-family home that involves soil disturbances of one (1) or more acres but less than or equal to five (5) acres and is not located in one of the watersheds listed in Appendix C and not directly discharging to one of the 303(d) segments listed in Appendix D; and c. construction on agricultural property that involves soil disturbances of one (1) or more acres but less than five (5) acres; and d. construction activities located in the New York City Watershed located east of the Hudson River, see Appendix C Figure 1, that involve soil disturbances of 5,000 square feet or more, but less than one acre. 2. The qualified inspector must conduct site inspections in accordance with the following timetable: a. For construction sites where soil disturbance activities are on-going, the qualified inspector must conduct a site inspection at least once every seven (7) calendar days; or b. For construction sites where soil disturbance activities are on-going and the owner or operator has received authorization in accordance with Part I.E.6. to disturb greater than five (5) acres of soil at any one time, the qualified inspector must conduct at least two (2) site inspections every seven (7) calendar days. The two (2) inspections must be separated by a minimum of two (2) full calendar days; or c. For construction sites where soil disturbance activities have been temporarily suspended (e.g. winter shutdown) and temporary stabilization measures have been applied to all disturbed areas, the qualified inspector must conduct a site inspection at least once every thirty (30) calendar days. The owner or operator must notify the DOW Water (SPDES) Program contact at the Regional Office (see contact information in Appendix E) or, in areas under the jurisdiction of a Traditional Land Use Control MS4 Operator, the Traditional Land Use Control MS4 Operator (provided the Traditional Land Use Control MS4 Operator is not the owner or operator of the construction activity) by hard copy or email prior to reducing the inspections to this frequency and again by hard copy or email prior to re-commencing construction; or 39 Page 745 of 849