Part IV.C.1.a.
  not located in one of the watersheds listed in Appendix C and not directly
  discharging to one of the 303(d) segments listed in Appendix D; and

  b. the construction of a single-family home that involves soil disturbances of
  one (1) or more acres but less than or equal to five (5) acres and is not
  located in one of the watersheds listed in Appendix C and not directly
  discharging to one of the 303(d) segments listed in Appendix D; and

  c. construction on agricultural property that involves soil disturbances of one
  (1) or more acres but less than five (5) acres; and

  d. construction activities located in the New York City Watershed located
  east of the Hudson River, see Appendix C Figure 1, that involve soil
  disturbances of 5,000 square feet or more, but less than one acre.

2. The qualified inspector must conduct site inspections in accordance with the
  following timetable:

  a. For construction sites where soil disturbance activities are on-going, the
  qualified inspector must conduct a site inspection at least once every
  seven (7) calendar days; or

  b. For construction sites where soil disturbance activities are on-going and
  the owner or operator has received authorization in accordance with Part
  I.E.6. to disturb greater than five (5) acres of soil at any one time, the
  qualified inspector must conduct at least two (2) site inspections every
  seven (7) calendar days. The two (2) inspections must be separated by a
  minimum of two (2) full calendar days; or

  c. For construction sites where soil disturbance activities have been
  temporarily suspended (e.g. winter shutdown) and temporary stabilization
  measures have been applied to all disturbed areas, the qualified inspector
  must conduct a site inspection at least once every thirty (30) calendar
  days. The owner or operator must notify the DOW Water (SPDES)
  Program contact at the Regional Office (see contact information in
  Appendix E) or, in areas under the jurisdiction of a Traditional Land Use
  Control MS4 Operator, the Traditional Land Use Control MS4 Operator
  (provided the Traditional Land Use Control MS4 Operator is not the owner
  or operator of the construction activity) by hard copy or email prior to
  reducing the inspections to this frequency and again by hard copy or email
  prior to re-commencing construction; or