Text · page 749 of 849
Read the whole document on one page (all 849 pages, each with its own heading)
Part IV.C.5.a.i. i. begin implementing corrective actions within one business day; and ii. complete the corrective actions within five business days; or b. if the corrective action requires engineering design: i. begin the engineering design process within five business days; and ii. complete the corrective action in a reasonable time frame but no later than within 60 calendar days. 6. All inspection reports must be signed by the qualified inspector. In accordance with Part I.E.3., the inspection reports must be maintained on site with the SWPPP. Part V. How to Terminate CGP Coverage A. Electronic Notice of Termination (eNOT) Submittal The eNOT contains questions to ensure requirements in Part V.A. have been met. 1. An owner or operator must terminate coverage when one or more of the following requirements have been met: a. Total project completion: i. all construction activity identified in the SWPPP has been completed; and ii. all areas of disturbance have achieved final stabilization; and iii. all temporary, structural erosion and sediment control measures have been removed; and iv. all SMPs have been constructed in conformance with the SWPPP and are operational; and v. an as-built drawing has been prepared; or 43 Page 749 of 849