Part IV.C.5.a.i.
  i. begin implementing corrective actions within one business day; and

  ii. complete the corrective actions within five business days; or

  b. if the corrective action requires engineering design:

  i. begin the engineering design process within five business days;
  and

  ii. complete the corrective action in a reasonable time frame but no
  later than within 60 calendar days.

  6. All inspection reports must be signed by the qualified inspector. In
  accordance with Part I.E.3., the inspection reports must be maintained on site
  with the SWPPP.

Part V. How to Terminate CGP Coverage

  A. Electronic Notice of Termination (eNOT) Submittal

  The eNOT contains questions to ensure requirements in Part V.A. have been
  met.

  1. An owner or operator must terminate coverage when one or more of the
  following requirements have been met:

  a. Total project completion:

  i. all construction activity identified in the SWPPP has been
  completed; and

  ii. all areas of disturbance have achieved final stabilization; and

  iii. all temporary, structural erosion and sediment control measures
  have been removed; and

  iv. all SMPs have been constructed in conformance with the SWPPP
  and are operational; and

  v. an as-built drawing has been prepared; or

  43