Text · page 20 of 35
Read the whole document on one page (all 35 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Agency Use Only [If applicable] Project: Date; Short Environmental Assessment FormPart 3 Determination of Significance For every question in Part 2 that was answered “moderate to large impact may occur,” or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact, please complete Part 3. Part 3 should, in sufficient detail, identify the impact, including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant. Each potential impact should be assessed considering its setting, probability of occurring, duration, irreversibility, geographic scope and magnitude. Also consider the potential for short- term, Jong-term and cumulative impacts. The proposed action will not effect the Village of Springville in anyway. It will stop and and all construction/use of Al Data Centers and Stand alone battery storage units within the village limits until furture research can be uptained. | Check this box if you have determined, based on the information and analysis above, and any supporting documentation,that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required. Check this box if you have determined, based on the information and analysis above, and any supporting | documentation,that the proposed action will not result in any significant adverse environmental impacts. Village of Springville 10/19/26 _ oe | Name of Lead Agency Date | Rus Belscher__ a : a Print or Type Name of Responsible Officer in Lead Agency Title of Responsibic Officer in Lead Agency Signature of Responsible Officer in Lead Agency Signature of Preparer (if different from Responsible Officer) Page 2 of 2 SEAF 2026