Text · page 1153 of 1493
Read the whole document on one page (all 1493 pages, each with its own heading)
sections 7209N and 7301 of the New York State Education Law for any person, unless acting under the direction of a registered architect, licensed engineer or land surveyor to alter this drawing. If altered such R.A., P.E. or L.L.S. shall affix his or her seal, signature, the date,the notation "Altered By" and a specific description of the alteration. UE All Rights Reserved. Reuse of these documents without the expressed written permission of CARMINAWOOD DESIGN is prohibited. WARNING it is a violation of article 145 Greensboro G UE EX. PIN CB W RIM:683.34 APPROX. LOCATION G N. INV:672.94 (18") ST UE S. INV:673.10 (18") Utica OE SA CB W " RIM:680.53 G ' - 32 UE 8 N. INV:671.23 (18") EX 5A' N . -5 CB OE ° ST W 5.2 S 2' E OE Buffalo 0 S. INV:671.23 (18") .N . 10 RIM:685.39 0.3G AI N. INV:677.49 (18") L UE 87°-09'-45" S. INV:677.49 (16") EX. UTILITY POLE TO BE RELOCATED. E. INV:676.99 (4") W CONTRACTOR TO COORDINATE WITH STG OR UTILITY COMPANY. UE SA O T MH OE T .L RIM:685.89 BI W NW. INV:676.14 (12") C G UE HEATED ENCLOSURE SE. INV:676.22 (12") 6" TAPPING SLEEVE HA FOR 6" RPZ & METER SA & VALVE (BY ECWA) 1.0 W PP . OE 6"-45° BENDS G 'E UE PRO ST Multifamily Development PO W/A F.F.E EX. REBAR RD SED TT . = 4.11' N. WATERTIGHT CONNECTION 1-S ACH 681 W OE TO EX. MH, INV 676.30 TO ED .60 SA G UE R Y GA 6" AWWA C-900 PVC WATER 5-U RAG MAIN (MIN. 5' COVER) NIT ES PA BU W 113°-18'-53" OE ILD UE G IN 338 LF 3" FUSED HDPE PRIVATE G# FORCE MAIN (MIN. 4' COVER) SA 2 RK INV 679.80 SWT OE REDUCE TO 2" PROPOSED 1-STORY 4-UNIT BUILDING #3 UE 18" MIN. VERTICAL 34 LF 8" SDR-35 G DOMESTIC SERVICE INSTALL C.O., TRAP AND INSIDE BUILDING EX. PIN SEPARATION (TYP.) PVC PRIVATE SAN VENT1 IN GREENSPACE SAN MH 1 W/ATTACHED GARAGES # SEWER @ 0.4% RO ING 44 LF 6" SDR-35 PVC C.O. RIM 684.10 SA GS 1425 & 1475 Orchard Park Rd F.F.E. = 681.15 6"x6"x4" TEE I L D OE PP ' E. INV 675.60 W 6" STM INV 680.54 BU SANITARY SEWER INV 680.10 NW UE 4" GATE VALE IT GES 0.8 3" SAN INV 679.29 U N INV 679.36 SW PROPOSED 1-STORY 4-UNIT BUILDING #4 A LATERAL @ 1.0% MIN. Y-4 GAR 0 T 4" AWWA C-900 R INV 676.44 NE INSTALL C.O., TRAP AND PVC DOMESTIC TO ED .8 1-S ACH = 684 AD VENT IN GREENSPACE WATER SERVICE D SE TT . OE W/ATTACHED GARAGES PO W/A F.F.E W EX 9' N UE (MIN. 5' COVER) O PR SA 5.8 /L W G G F.F.E. = 680.40 92 LF 6" SDR-35 PVC SANITARY .R . ±OST E SEWER LATERAL @ 1.0% MIN. © CARMINA WOOD DESIGN EB REDUCE TO 2" STOP REDUCE TO 2" DOMESTIC SERVICE (6 DOMESTIC SERVICE West Seneca, NY AR O 4" AWWA C-900 UE INSIDE BUILDING 6" STM INV 677.12 INSIDE BUILDING 6" SAN INV 675.20 PVC DOMESTIC INV 674.15 6.0 WATER SERVICE SA 6"x4" REDUCER INSTALL C.O., TRAP AND 6"x6"x4" TEE (MIN. 5' COVER) HYDRANT 12" STM INV 676.98 4" GATE VALE VENT IN GREENSPACE 4" GATE VALE UE ASSEMBLY 6" SAN INV 675.04 ST REDUCE TO 2" 6"-45° BENDS 47 LF 6" SDR-35 PVC SANITARY W 4"-45° BENDS ') OE DOMESTIC SERVICE SEWER LATERAL @ 2.4% MIN. 6" AWWA C-900 PVC WATER 6"-22.5° OE 6"x6"x6" TEE & (2) PP G INSIDE BUILDING 4" AWWA C-900 PVC DOMESTIC MAIN (MIN. 5' COVER) BEND OE OE PP SERVICE (MIN. 5' COVER) 6" GATE VALVES OE 12" STM INV 674.98 OE 1.0' E. SA UE INV 673.15 4"-45° BENDS OE 6" SAN INV 673.86 OE OE EX. IP. 11 18" MIN. VERTICAL OE WT INSTALL C.O., TRAP AND 8" STM INV 680.18 OE S OE SEPARATION (TYP.) 5° VENT IN GREENSPACE 4" GATE VALE 3" SAN INV 678.47 PP 7.27' NW. OE -0 G 4'- SA COORDINATE GAS, CTV AND ELECTRIC PARKING SAN MH 2 47 6"x6"x4" TEE STOP 6/17/26 6"-22.5° PUMP STATION UTILITY LOCATION AND SIZE WITH LOT " W OE OE UTILITY COMPANIES AND MEP DRAWINGS Date 202 LF 8" SDR-35 BEND RIM 682.40 15 LF 6" SDR-35 PVC SANITARY G C.O. INV 678.40 NE ST SEWER LATERAL @ 1.0% MIN. C.O. SAN MH 5 PVC PRIVATE SAN RIM 678.00 SEWER @ 0.4%12" INV 674.68 N A W 4" AWWA C-900 PVC DOMESTIC INV 670.68 W, SW RE OE 71 LF 6" SDR-35 PVC SANITARY INV 673.68 N A OE W SERVICE (MIN. 5' COVER) SEWER LATERAL @ 1.0% MIN. INV 671.59 W COORDINATE GAS, CTV AND ELECTRIC 6" AWWA C-900 PVC DOMESTIC . WATER (MIN. 5' COVER) BIT Per Engineering comments SA INV 671.49 E UTILITY LOCATION AND SIZE WITH UTILITY COMPANIES AND MEP DRAWINGS 12" 170°-37'-13" 71 LF 6" SDR-35 PVC SANITARY OE HYD ST G E SEWER LATERAL @ 1.0% MIN. APPROX. LOCATION CONTRACTOR TO VERIFY LIMITS OF O W OF CEMETERY CEMETERY AND NOTIFY DESIGN 18" STM INV 674.00 ENGINEER OF ANY POTENTIAL CONFLICTS HEAD STONES NOT No. Description 8" SAN INV 672.50 SA 673.50 LOCATED 127°-49'-44" G OE REVISIONS: W 673.50 ST 14" 6"-22.5° 28" BEND 14" 1 EX. IP. W. INV: 682.97 180 LF 8" SDR-35 4" AWWA C-900 PVC PVC PRIVATE SAN (12" HDPE) 18" MIN. VERTICAL DOMESTIC SERVICE SEWER @ 0.4% Utility Plan - North SCALE: 1"=30' PROPOSED UTILITY LEGEND PROPOSED STORM SEWER ST PROPOSED SANITARY SEWER 6" SA UTILITY NOTES: NOTES: 1" W PROPOSED WATERLINE 1. FOR ALL SANITARY SEWERS, INSTALL SELECT FILL IN PAVED AREAS, EXTEND 5' MIN. BEYOND PAVEMENT LIMITS 1. ALL SANITARY SEWER CONSTRUCTION SHALL CONFORMTOWNTOOF WEST SENECA SEWER SPECIFICATIONS AND DETAILS, AND ERIE COUNTY DEPARTMENT OF HEALTH RULES AND 2. BUILDINGS TO HAVE6"AHOUSE TRAP, VENT AND CLEANOUT INSTALLED AT ENTRANCE POINT. INVERT ELEVATION REGULATIONS. PROPOSED CATCH BASIN CB TO BE5' MIN.BELOW F.F.E. OF THE BUILDING. PIPE TO 6" SDR-35 BE PVC @ 1.0% MIN WITH MIN 4' OF COVER. ADD ADDITIONAL CLEANOUTS @ 100' MAX. SPACING 6" LATERALS FOR OVER 90' IN LENGTH. 2. PRIOR STARTING ANY WORK ASSOCIATED WITH OR NEAR EXISTING SANITARY MANHOLES, THE CONTRACTOR SHALL MEET WITHTOWN THE OF WEST SENECA TO DISCUSS AND AGREE PROPOSED YARD DRAIN YD DRAWING NAME: 3. COORDINATE GAS & ELEC. METER BANK LOCATIONS ON BUILDINGS WITH M.E.P. PLANS & UTILITY CO.'S. TO THE WORK. 4. COORDINATE LOCATION OF CTV & TELEPHONE SERVICE TO BUILDINGS WITH M.E.P. PLANS AND UTILITY CO.'S. 3. FILL SHALL BE PLACED AND SATISFACTORILY COMPACTED PRIOR TO INSTALLATION OF PROPOSED MANHOLE MH Utility Plan - North UTILITIES, AND MUST BE APPROVED BY THE SUPERVISING PROJECT ENGINEER. 5. ANY EXISTING UTILITIES WHICH ARE TO BE ABANDONED AND FALL UNDER PAVEMENT OR BUILDINGS SHALL BE REMOVED VS. BEING ABANDONED UNLESS THOSE UTILITIES ARE FILLED WITH FLOWABLE FILL. 4. ALL OTHER REQUIRED PERMITS BY THE STATE OF NEW YORK, COUNTY OFTOWN ERIE AND PROPOSED HYDRANT ASSEMBLY OF WEST SENECA ARE THE RESPONSIBILITY OF THE CONTRACTOR/DEVELOPER. 6. EXISTING GAS SERVICES TO REMAIN UNLESS OTHERWISE NOTED. ANY PORTIONS TO BE RELOCATED SHALL BE COORDINATED WITH NATIONAL FUEL GAS. PROPOSED GATE VALVE GV 7. ALL UNDERGROUND TELEPHONE SERVICES SHALL REMAIN AND BE PROTECTED DURING CONSTRUCTION. NOTE: FOR PROPOSED VALVE BOXES, CLEANOUTS, ETC., INSTALL A Date: 5/22/26 3,000 PSI CONCRETE COLLAR AROUND THE ITEM AT GRADE. THE Drawn By: A. Pandolfe 8. A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES OF VERTICAL SEPARATION MUST BE MAINTAINED BETWEEN ALL COLLAR SHALL BE A MINIMUM OF 6" WIDER, ON ALL SIDES, THAN THE Scale: As Noted SANITARY SEWER AND WATER SERVICES. BOX, CLEANOUT, ETC. THE COLLAR SHALL BE A MINIMUM OF 6" THICK. DRAWING NO. 9. ERIE COUNTY WATER AUTHORITY (ECWA) IS TO BE NOTIFIED A MINIMUM OF 48-HOURS PRIOR TO STARTING THE CONNECTION TO THE NEW WATER SERVICE. 10. SELECT BACKFILL IS REQUIRED FOR ALL UTILITIES (GAS, WATER, STORM, SANITARY) THAT CROSS THROUGH PAVEMENT AREAS. NOTE: BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY OTHERS, CARMINA WOOD DESIGN ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. 30 0 30 60Ft. C-401 Project No: 23-4121 30' Page 1153 of 1493