Response: Not Applicable

  d. Bus Shelter
  Response: Building plans for the bus shelter, and all other proposed structures, will
  be reviewed and approved by the Building Department under a separate application.

  e. Emergency Spillway
  Response: Detail has been added to Sheet C-303

  f. Dumpster enclosure pad
  Response: The dumpster pad will be the same as the concrete slab on grade detail
  and is noted as such on the site plans.

C-0 Series - Erosion & sediment Control Plans
  1. Please indicate the full extent of the limits of disturbance on the ESC plan. Also indicate the
  total acreage of proposed disturbance. (This can be shown slightly offset from the true
  disturbance to avoid linework conflicts.)
  Response: The limits of disturbance and total acreage of disturbance are shown and
  noted on Sheet C-001.

  2. Please add contour labels to the ESC plan.
  Response: Contour labels have been added to Sheet C-001.

  3. Please provide a ‘Protective Fencing Detail’ as this is called out for protecting the cemetery.
  Has consideration been given to the effects of vibrations caused by heavy machinery (diggers,
  vibratory rollers, etc.) to the existing gravestones?
  Response: This note has been updated to indicate the fencing to be orange mesh
  construction fencing and for the contractor to submit shop drawings prior to
  construction. Consideration has been given to the proximity of the cemetery and it is
  our opinion that there is a sufficient buffer so as to not disturb the existing gravestones.

  4. Please show the location for the construction trailer office/ contractor staging areas on the
  ESC plans.
  Response: Location of the construction trailer office / contractor staging area has been
  added to Sheet C-001.

  5. Wherever possible, please adjust silt sock/fence to be installed parallel to contours.
  Response: Where possible, the silt sock / fence has been adjusted accordingly.

  6. Please include a note on the plan to indicate that stumps and brush may not be buried in the
  Town and that topsoil may not be removed from the work site without a permit.
  Response: The requested not has been added to Sheet C-001.