C-2 Series - Grading Plans 1. Per the site plan checklist, the minimum slope of pavement is to be 1.5%. While the majority of asphalt grades are close to this, and drainage is not anticipated to be a major concern as shown, please review grading plans to best attempt to meet this requirement within reason. Response: The pavement grading, especially on the north section, was largely constrained due to placement of the buildings and the existing grade. It is our opinion that the 1.2% minimum slope will be sufficient to provide proper drainage. 2. It is assumed that two separate bioretention areas have been included in order to ensure each falls under the maximum contributing area threshold of 5-acres. We’d recommend to the applicant to further vertically separate these two bioretention areas to ensure they act independently from each other. Furthermore, we’d recommend the applicant review the potential need for rip-rap stabilization on the larger detention area’s side slopes adjacent to the bioretention basins to prevent erosion in the case the bioretention basins overflow. Response: The grading plan has been revised to note a berm is to be installed between the two bioretention areas to ensure that they acti independently. In the case of overflow, runoff will be directed to the detention area, which has been noted to be lined with rip-rap. C-3 Series - Drainage Plans/ Details 1. Please provide an outlet structure detail for the bioretention areas clearly showing the elevations of the proposed outlets. Maintain coordination with the HydroCAD model for these elevations. Response: An outlet structure detail has been added to Sheet C-303. C-4 Series - Utility Plans/ Details 1. Please provide utility profiles for all proposed Sanitary Sewers/Laterals and Water service lines ensuring that all utility crossings are included. Response: Utility profiles are shown on Sheet C-406. 2. While it is anticipated final locations will be coordinated with and determined by the utility provider, please provide approximate locations for electrical and gas services. Response: Approximate locations for electrical and gas services have been added to the utility plans. 3. Please relocate San MH-1 further to the South such that the new gravity section of sewer is perpendicular with the existing manhole. The proposed force main and 6” gravity sewer lateral form the adjacent building can be extended and routed into the manhole. This will improve the hydraulics of the sewage from the site entering the Town System and eliminates a potential conflict with existing catch basins. Response: SAN MH 1 has been relocated as requested. 4. We recommend the applicant utilize fused 3” or 4” HDPE pipe instead of 3” SDR-21 PVC pipes as it will help eliminate bends and pipe joints which are potential points for leaks. Page 1168 of 1493