Text · page 1169 of 1493
Read the whole document on one page (all 1493 pages, each with its own heading)
Response: The force main pipe material has been revised from PVC to fused HDPE. 5. We recommend the applicant relocate the sanitary lateral from the Northern apartment building such that it discharges directly into San MH-2 as opposed to the sewer main in order to provide improve maintenance access. Response: The lateral in question has been relocated to connect directly to SAN MH 2. 6. Please provide more information on the size and capacity of the proposed sanitary pumps in order to ensure the discharge rate is not high enough to inundate the Town’s sewers. Response: The pump characteristic table on the pump station detail has been filled in on Sheet C-404. L-Series - Landscaping Plans/ Details 1. Please review the planting details for trees, evergreens, and shrubs. The Town of West Seneca states that the ‘crown of the root ball is to be 6” above finished grade for trees and 3” above finished grade for shrubs’. Response: The planting details have been updated accordingly. SWPPP Comments 1. Please add the SBL to Section 102 of the SWPPP document. Response: SBL No’s. added to Section 102. 2. In Section 110, it is understood that New York State Historic Preservation Office has given clearance to the project. Has the project engineer or developers reached out to West Seneca Historical Society or New York State Division of Cemeteries to receive input/comment on the potential impact to the onsite cemetery? The cemetery, St. Paul’s Union Church of Christ Cemetery, is registered with the Town of West Seneca and is listed as an active cemetery. Correspondence with the Church should be had about the nature of how active the cemetery is, if there are any remaining plots to be filled or plots already purchased for use, and if these plots have been taken into account in the project design. Please forward all correspondence to the review engineers. Response: The onsite cemetery is not listed on the New York State Division of Cemeteries list as an active cemetery. Conversations with representatives from the Church indicate that activity levels are low and that there are no remaining plots to be filed nor plots that have been purchased. The last burial at this cemetery was in 1921. 3. Is more than 5 acres of disturbance at one time proposed? If so, a waiver will need to be obtained from the Town of West Seneca. Number 23 of the eNOI was answered in the affirmative, if this is case then please specifically state this in the SWPPP document. Response: It is expected that more than 5 acres will be disturbed at one time. The need for a 5 acre waiver has been added to Section 104 – Project Description. 4. Please mention the protective fence for the cemetery in Section 112.3 of the SWPPP. Page 1169 of 1493