Text · page 1170 of 1493
Read the whole document on one page (all 1493 pages, each with its own heading)
Response: Installation of the temporary protective fencing around the cemetery has been added to Section 112.3. 5. Please include the number for NYSDEC Spill Response in section 118.3 B3 of the SWPPP. Response: The NYSDEC Spill Response number has been added to this section. 6. Please provide scaled pre and post drainage area maps for review including all watersheds, hatches indicating different types of land covers, and a time of concentration line. Please ensure these are annotated to correspond to the HydroCAD report. Response: Pre and post construction drainage area maps have been added to the Engineer’s Report in Appendix D. 7. Please provide pre and post drainage area descriptions within the SWPPP. Response: Pre and post drainage area descriptions are provided in Section 104 – Project Description and Section 112.4 – Storm Water Management. 8. Please provide stage-storage table for the proposed bioretention node in the HydroCAD model. Response: The bioretention areas have been added to the HydroCAD model. 9. Please ensure all rainfall inputs into the HydroCAD model have been set following Section 4.9 of NYSDEC’s 2024 Stormwater Management Design Manual. Response: The rainfall inputs have been set accordingly per the NYSSMDM. 10. Many of the HydroCAD nodes have warnings that the peak is exceeding the capacity. Please review and address or offer an explanation to these warnings. Response: The warnings refer to the runoff exceeding the capacity of the pipe that is modeled as part of the time of concentration. This is because the program assumes that all of the runoff from the subcatchment flows through this pipe, which is not the case. 11. Please include a final link node in the HydroCAD reports to directly compare the total runoff offsite of the existing and proposed conditions. Response: A final link has been added to the model accordingly. 12. It is recommended with a site of this size to further break-up watersheds, especially in the proposed conditions HydroCAD report to improve the accuracy, and better size the proposed drainage piping. Response: This is essentially achieved via the pipe sizing calculations provided which very closely match the HydroCAD model. 13. Please provide stormwater pipe sizing calculations. Response: Pipe sizing calculations have been added to the Engineer’s Report in Appendix D. Page 1170 of 1493