Project Name: Multifamily Development - 1425 & 1475 Orchard Park Rd Job Number: 23-4121 Re: Storm Sewer Pipe Sizing Calculations Calculated By: AJP Date: 06/17/26 STORM SEWER PIPE SIZING CALCULATIONS INLET & TRIBUTARY RUNOFF INLET TIME OF INTENSITY RUNOFF Q PIPE DESIGN PIPE FLOW STORM SEWER AREA (A) COEFF. TIME CONCEN. i (10-yr) DIRECT SUM DIA S V Q L TIME LOCATION (sq ft) (acres) C (min) (total-min) (in/hr) (cfs) (cfs) (in) (ft/ft) n (fps) (cfs) (ft) (min) YD 4 1933 0.04 0.20 21.5 21.5 2.90 0.03 0.03 to 6 0.0050 0.013 2.03 0.40 130 1.1 YD 5 8896 0.20 0.61 21.5 22.5 2.90 0.36 0.39 to 6 0.0050 0.013 2.03 0.40 52 0.4 CB 2 YD 1 8274 0.19 0.20 14.0 14.0 3.60 0.14 0.14 to 6 0.0050 0.013 2.03 0.40 66 0.5 YD 2 8696 0.20 0.50 15.2 15.2 3.40 0.34 0.47 to 8 0.0080 0.013 3.10 1.08 70 0.4 YD 3 749 0.02 0.20 2.1 15.6 3.40 0.01 0.48 to 8 0.0080 0.013 3.10 1.08 149 0.8 CB 3 CB 6 10135 0.23 0.60 9.6 9.6 4.30 0.60 0.60 to 8 0.0050 0.013 2.45 0.86 126 0.9 CB 5 14271 0.33 0.79 6.7 10.5 4.10 1.06 1.67 to 12 0.0050 0.013 3.22 2.52 51 0.3 YD 7 6970 0.16 0.57 9.8 10.7 4.10 0.37 2.04 to 12 0.0050 0.013 3.22 2.52 71 0.4 CB 4 CB 7 8721 0.20 0.65 14.4 14.4 3.50 0.45 0.45 to 12 0.0030 0.013 2.49 1.96 82 0.5 CB 8 21631 0.50 0.82 9.6 16.4 3.30 1.34 2.27 to 12 0.0050 0.013 3.22 2.52 63 0.3 STM MH 1 CB 1 8357 0.19 0.55 12.6 12.6 3.80 0.40 0.40 to 8 0.0070 0.013 2.90 1.01 100 0.6 CB 2 10541 0.24 0.75 6.5 23.0 2.90 0.53 1.32 to 12 0.0070 0.013 3.81 2.99 132 0.6 CB 3 13150 0.30 0.51 20.8 23.5 2.80 0.43 2.23 to 12 0.0100 0.013 4.55 3.57 148 0.5 CB 4 14499 0.33 0.65 8.4 24.1 2.80 0.60 4.87 to 15 0.0100 0.013 5.28 6.47 131 0.4 STM MH 1 24.5 2.80 0.00 7.15 to 18 0.0100 0.013 5.96 10.53 121 0.3 Bioretention #1 YD 8 4185 0.10 0.20 10.2 10.2 4.20 0.08 0.08 to 8 0.0050 0.013 2.45 0.86 63 0.4 23-4121 Storm Pipe Sizing Spreadsheet.xls 1 6/18/2026 Page 1252 of 1493