Project Name: Multifamily Development - 1425 & 1475 Orchard Park Rd Job Number: 23-4121 Re: Storm Sewer Pipe Sizing Calculations Calculated By: AJP Date: 06/17/26 STORM SEWER PIPE SIZING CALCULATIONS INLET & TRIBUTARY RUNOFF INLET TIME OF INTENSITY RUNOFF Q PIPE DESIGN PIPE FLOW STORM SEWER AREA (A) COEFF. TIME CONCEN. i (10-yr) DIRECT SUM DIA S V Q L TIME LOCATION (sq ft) (acres) C (min) (total-min) (in/hr) (cfs) (cfs) (in) (ft/ft) n (fps) (cfs) (ft) (min) YD 9 3540 0.08 0.20 14.3 14.3 3.60 0.06 0.14 to 8 0.0050 0.013 2.45 0.86 73 0.5 YD 10 8114 0.19 0.66 10.2 14.8 3.50 0.43 0.57 to 8 0.0050 0.013 2.45 0.86 85 0.6 YD 11 2896 0.07 0.20 16.5 16.5 3.30 0.04 0.62 to 8 0.0050 0.013 2.45 0.86 36 0.2 CB 9 3540 0.08 0.73 14.3 16.8 3.30 0.20 0.81 to 12 0.0080 0.013 4.07 3.19 209 0.9 CB 10 25464 0.58 0.61 13.2 17.6 3.20 1.14 1.96 to 12 0.0110 0.013 4.77 3.74 123 0.4 CB 11 12587 0.29 0.79 4.4 18.0 3.20 0.73 2.68 to 12 0.0110 0.013 4.77 3.74 121 0.4 Bioretention #2 23-4121 Storm Pipe Sizing Spreadsheet.xls 2 6/18/2026 Page 1253 of 1493