Southtowns Record

PBA07.09.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jul 9, 2026, 6:00 p.m.
Posted by publisher
Jul 9, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 304 of 1493

Read the whole document on one page (all 1493 pages, each with its own heading)

AlternativeȱStormwaterȱManagementȱ
  DeepȬRippingȱandȱDecompactionȱ
  ȱ  ȱ  ȱ ȱ  ȱ  ȱ  ȱ  ȱ  ȱ  Recommended Application of Practice
  Description
  Theȱobjective of Deep Ripping and
  The two-phase practice of 1) “Deep Ripping;” and 2) “Decompaction” (deep subsoiling), of the  Decompaction is to effectively fracture
  soil material as a step in the cleanup and restoration/landscaping of a construction site, helps  (vertically and laterallly) through the thickness
  mitigate the physically induced impacts of soil compression; i.e.: soil compaction or the  of the physically compressed subsoil material
  substantial increase in the bulk density of the soil material.  (see Figure 3), restoring soil porosity and
  permeability and aiding infiltration to help
  Deep Ripping and Decompaction are key factors which help in restoring soil pore space and  reduce runoff. Together with topsoil stripping,
  permeability for water infiltration. Conversely, the physical actions of cut-and-fill work, land  the “two-phase” practice of Deep Ripping and
  grading, the ongoing movement of construction equipment and the transport of building  Decompaction first became established as a “best
  materials throughout a site alter the architecture and structure of the soil, resulting in: the mixing  management practice” through ongoing success
  of layers (horizons) of soil materials, compression of those materials and diminished soil  on commercial farmlands affected by heavy  Fig. 3. Construction site with significant
  porosity which, if left unchecked, severely impairs the soil’s water holding capacity and vertical  utility construction right-of-way projects  compaction of the deep basal till subsoil
  drainage (rainfall infiltration), from the surface downward.  (transmission pipelines and large power lines).  extends 24 inches below this exposed cut-
  and-fill work surface.
  In a humid climate region, compaction damage on a site is virtually guaranteed over the duration  Soil permeability, soil drainage and cropland
  of a project. Soil in very moist to wet condition when compacted, will have severely reduced  productivity were restored. For broader
  permeability. Figure 1 displays the early stage of the deep-ripping phase (Note that all topsoil  construction application, the two-phase practice of Deep Ripping and Decompaction is best
  was stripped prior to construction access, and it remains stockpiled until the next phase –  adapted to areas impacted with significant soil compaction, on contiguous open portions of large
  decompaction – is complete). A heavy-duty tractor is pulling a three-shank ripper on the first of  construction sites and inside long, open construction corridors used as temporary access over the
  several series of incrementally deepening passes through the construction access corridor's  duration of construction. Each mitigation area should have minimal above-and-below-ground
  densely compressed subsoil material. Figure 2 illustrates the approximate volumetric  obstructions for the easy avoidance and maneuvering of a large tractor and ripping/decompacting
  composition of a loam surface soil when conditions are good for plant growth, with adequate  implements. Conversely, the complete two-phase practice is not recommended in congested or
  natural pore space for fluctuating moisture conditions.  obstructed areas due to the limitations on tractor and implement movement.

  Benefits

  Aggressive “deep ripping” through the compressed thickness of exposed subsoil before the
  replacement/respreading of the topsoil layer, followed by “decompaction,” i.e.: “sub-soiling,”
  through the restored topsoil layer down into the subsoil, offers the following benefits:

  x  Increases the project (larger size) area’s direct surface infiltration of rainfall by
  providing the open site’s mitigated soil condition and lowers the demand on
  concentrated runoff control structures
  Fig. 1. A typical deep ripping phase of this
  practice, during the first in a series of  Fig. 2. About 50% of the volume of undisturbed  x  Enhances direct groundwater recharge through greater dispersion across and through a
  progressively deeper “rips” through severely  loam surface soil is pore space, when soil is in  broader surface than afforded by some runoff-control structural measures
  compressed subsoil.  good condition for plant growth. Brady, 2002.
  x  Decreases runoff volume generated and provides hydrologic source control
  ȱ
  x  May be planned for application in feasible open locations either alone or in

  1
  2

Page 304 of 1493