conjunction with  plans for structural practices (e.g., subsurface drain line or  lawn/ground cover to help maintain the restored subsoil structure. Infiltration after construction-
  infiltration basin) serving the same or contiguous areas  induced mixing and compression of such subsoil material can be notably rehabilitated with the
  Deep Ripping and Decompaction practice, which prepares the site for the appropriate long-term
  x  Promotes successful long-term revegetation by restoring soil permeability, drainage and  lawn/ground cover mix including deep taproot plants such as clover, fescue or trefoil, etc. needed
  water holding capacity for healthy (rather than restricted) root-system development of  for all rehabilitated soils.
  trees, shrubs and deep rooted ground cover, minimizing plant drowning during wet
  periods and burnout during dry periods.  Generally, soils in Hydrologic Soil Groups A and B, which respectively may include deep, well-
  drained, sandy-gravelly materials or deep, moderately well-drained basal till materials, are among
  Feasibility/Limitations  the easier ones to restore permeability and infiltration, by deep ripping and decompaction. Among
  the many different soils in Hydrologic Soil Group C are those unique glacial tills having a natural
  The effectiveness of Deep Ripping and Decompaction is governed mostly by site factors such as:  fragipan zone, beginning about 12 to 18 inches (30 – 45cm), below surface. Although soils in
  the original (undisturbed) soil’s hydrologic characteristics; the general slope; local weather/timing  Hydrologic Soil Group C do require a somewhat more carefully applied level of the Deep Ripping
  (soil moisture) for implementation; the space-related freedom of equipment/implement  and Decompaction practice, it can greatly benefit such affected areas by reducing the runoff and
  maneuverability (noted above in Recommended Application of Practice), and by the proper  fostering infiltration to a level equal to that of pre-disturbance.
  selection and operation of tractor and implements (explained below in Design Guidance). The
  more notable site-related factors include:  Soils in Hydrologic Soil Group D typically have a permanent high water table close to the surface,
  influenced by a clay or other highly impervious layer of material. In many locations with clay
  Soil  subsoil material, the bulk density is so naturally high that heavy trafficking has little or no added
  In the undisturbed condition, each identified soil type comprising a site is grouped into one of  impact on infiltration; and structural runoff control practices rather than Deep Ripping and
  four categories of soil hydrology, Hydrologic Soil Group A, B, C or D, determined primarily by a  Decompaction should be considered.
  range of characteristics including soil texture, drainage capability when thoroughly wet, and depth
  to water table. The natural rates of infiltration and transmission of soil-water through the  The information about Hydrologic Soil Groups is merely a general guideline. Site-specific data
  undisturbed soil layers for Group A is “high” with a low runoff potential while soils in Group B  such as limited depths of cut-and-fill grading with minimal removal or translocation of the inherent
  are moderate in infiltration and the transmission of soil-water with a moderate runoff potential,  subsoil materials (as analyzed in the county soil survey) or, conversely, the excavation and
  depending somewhat on slope. Soils in Group C have slow rates of infiltration and transmission  translocation of deeper, unconsolidated substratum or consolidated bedrock materials (unlike the
  of soil-water and a moderately high runoff potential influenced by soil texture and slope; while  analyzed subsoil horizons’ materials referred to in the county soil survey) should always be taken
  soils in Group D have exceptionally slow  into account.
  rates of infiltration and transmission of soil-
  water, and high runoff potential.  Sites made up with significant quantities of large rocks, or having a very shallow depth to bedrock,
  are not conducive to deep ripping and decompation (subsoiling); and other measures may be more
  In Figure 4, the profile displays the  practical.
  undisturbed horizons of a soil in Hydrologic
  Soil Group C and the naturally slow rate of  Slope
  infiltration through the subsoil. The slow rate  The two-phase application of 1) deep ripping and 2) decompaction (deep subsoiling), is most
  of infiltration begins immediately below the  practical on flat, gentle and moderate slopes. In some situations, such as but not limited to
  topsoil horizon (30 cm), due to the limited  temporary construction access corridors, inclusion areas that are moderately steep along a project’s
  amount of macro pores, e.g.: natural subsoil  otherwise gentle or moderate slope may also be deep ripped and decompacted. For limited
  fractures, worm holes and root channels.  instances of moderate steepness on other projects, however, the post-construction land use and the
  Infiltration after the construction-induced  relative alignment of the potential ripping and decompaction work in relation to the lay of the
  mixing and compression of such subsoil  slope should be reviewed for safety and practicality. In broad construction areas predominated by
  material is virtually absent; but can be  moderately steep or steep slopes, the practice is generally not used.
  restored back to this natural level with the
  Fig. 4. Profile (in centimeters) displaying the  Local Weather/Timing/Soil Moisture
  two-phase practice of deep ripping and
  infiltration test result of the natural undisturbed  Effective fracturing of compressed subsoil material from the exposed work surface, laterally and
  decompaction, followed by the permanent
  horizons of a soil in Hydrologic Soil Group C.  vertically down through the affected zone is achieved only when the soil material is moderately
  establishment of an appropriate, deep taproot
  dry to moderately moist. Neither one of the two-phases, deep ripping nor decompaction (deep

  3  4