subsoiling), can be effectively conducted when the soil material (subsoil or replaced topsoil) is in  rainfall infiltration are being restored, a policy limiting all further traffic to permanent travel lanes
  either a “plastic” or “liquid” state of soil consistency. Pulling the respective implements legs  is maintained.
  through the soil when it is overly moist only results in the “slicing and smearing” of the material or
  added “squeezing and compression” instead of the necessary fracturing. Ample drying time is  The other critical elements, outlined below, are: using the proper implements (deep, heavy-duty
  needed for a “rippable” soil condition not merely in the material close to the surface, but  rippers and subsoilers), and ample pulling-power equipment (tractors); and conducting the practice
  throughout the material located down to the bottom of the physically compressed zone of the  at the appropriate speed, depth and pattern(s) of movement.
  subsoil.
  Note that an appropriate plan for the separate practice of establishing a healthy perennial ground
  The “poor man’s Atterberg field test” for soil  cover, with deep rooting to help maintain the restored soil structure, should be developed in
  plasticity is a simple “hand-roll” method used  advance. This may require the assistance of an agronomist or landscape horticulturist.
  for quick, on-site determination of whether or
  not the moisture level of the affected soil
  material is low enough for: effective deep  Implements
  ripping of subsoil; respreading of topsoil in a  Avoid the use of all undersize implements. The small-to-medium, light-duty tool will, at best, only
  friable state; and final decompaction (deep  “scarify” the uppermost surface portion of the mass of compacted subsoil material. The term
  subsoiling). Using a sample of soil material  “chisel plow” is commonly but incorrectly applied to a broad range of implements. While a few
  obtained from the planned bottom depth of  may be adapted for the moderate subsoiling of non-impacted soils, the majority are less durable
  ripping, e.g.: 20 - 24 inches below exposed  and used for only lighter land-fitting (see Figure 6).
  subsoil surface, the sample is hand rolled
  between the palms down to a 1/8-inch diameter
  thread. (Use the same test for stored topsoil  Fig. 5. Augered from a depth of 19 inches
  material before respreading on the site.) If the  below the surface of the replaced topsoil,
  respective soil sample crumbles apart in  this subsoil sample was hand rolled to a
  segments no greater than 3/8 of an inch long, by  1/8-inch diameter. The test shows the soil at
  the time it is rolled down to 1/8 inch diameter, it  this site stretches out too far without
  is low enough in moisture for deep ripping (or  crumbling; it indicates the material is in a
  topsoil replacement), and decompaction.  plastic state of consistence, too wet for final
  Conversely, as shown in Figure 5, if the rolled  decompaction (deep subsoiling) at this time.
  sample stretches out in increments greater than
  3/8 of an inch long before crumbling, it is in a “plastic” state of soil consistency and is too wet for
  subsoil ripping (as well as topsoil replacement) and final decompaction.
  Fig. 6. A light duty chisel implement, not  Fig. 7. One of several variations of an
  adequate for either the deep ripping or  agricultural ripper. This unit has long, rugged
  Design Guidance
  shanks mounted on a steel V-frame for deep,
  decompaction (deep subsoiling) phase.
  aggressive fracturing through Phase 1.
  Beyond the above-noted site factors, a vital requirement for the effective Deep Ripping and
  Decompaction (deep subsoiling), is implementing the practice in its distinct, two-phase process:
  Use a “heavy duty” agricultural-grade, deep ripper (see Figures 7,9,10 and 11) for the first phase:
  1) Deep rip the affected thickness of exposed subsoil material (see Figure 10 and 11), aggressively  the lateral and vertical fracturing of the mass of exposed and compressed subsoil, down and
  fracturing it before the protected topsoil is reapplied on the site (see Figure 12); and  through, to the bottom of impact, prior to the replacement of the topsoil layer. (Any oversize rocks
  which are uplifted to the subsoil surface during the deep ripping phase are picked and removed.)
  2) Decompact (deep subsoil), simultaneously through the restored topsoil layer and the upper half  Like the heavy-duty class of implement for the first phase, the decompaction (deep subsoiling) of
  of the affected subsoil (Figure 13). The second phase, “decompaction,” mitigates the partial  Phase 2 is conducted with the heavy-duty version of the deep subsoiler. More preferable is the
  recompaction which occurs during the heavy process of topsoil spreading/grading. Prior to deep  angled-leg variety of deep subsoiler (shown in Figures 8 and 13). It minimizes the inversion of the
  ripping and decompacting the site, all construction activity, including construction equipment and  subsoil and topsoil layers while laterally and vertically fracturing the upper half of the previously
  material storage, site cleanup and trafficking (Figure 14), should be finished; and the site closed off  ripped subsoil layer and all of the topsoil layer by delivering a momentary, wave-like “lifting and
  to further disturbance. Likewise, once the practice is underway and the area’s soil permeability and  shattering” action up through the soil layers as it is pulled.