Southtowns Record

PBA07.09.2026packet

Government
Town of West Seneca
Board
Planning Board
Meeting
Jul 9, 2026, 6:00 p.m.
Posted by publisher
Jul 9, 2026
Kind
Agenda packet
Topics
Water, sewer and drainage, Housing, Zoning and land use, Roads and traffic, Parks and recreation, Budget and taxes, Public safety

Original document

Same meeting

Text · page 307 of 1493

Read the whole document on one page (all 1493 pages, each with its own heading)

Pulling-Power of Equipment  Depth and Patterns of Movement
  Use the following rule of thumb for tractor horsepower (hp) whenever deep ripping and  As previously noted both Phase 1 Deep Ripping through significantly compressed, exposed subsoil
  decompacting a significantly impacted site: For both types of implement, have at least 40 hp of  and Phase 2 Decompaction (deep subsoiling) through the replaced topsoil and upper subsoil need
  tractor pull available for each mounted shank/ leg.  to be performed at maximum capable depth of each implement. With an implement’s guide wheels
  attached, some have a “normal” maximum operating depth of 18 inches, while others may go
  Using the examples of a 3-shank and a 5-shank implement, the respective tractors should have 120  deeper. In many situations, however, the tractor/implement operator must first remove the guide
  and 200 hp available for fracturing down to the final depth of 20-to-24 inches per phase. Final  wheels and other non essential elements from the implement. This adapts the ripper or the deep
  depth for the deep ripping in Phase 1 is achieved incrementally by a progressive series of passes  subsoiler for skillful pulling with its frame only a few inches above surface, while the shanks or
  (see Depth and Patterns of Movement, below); while for Phase 2, the full operating depth of the  legs, fracture the soil material 20-to-24 inches deep.
  deep subsoiler is applied from the beginning.
  There may be construction sites where the depth of the exposed subsoil’s compression is moderate,
  The operating speed for pulling both types of  e.g.: 12 inches, rather than deep. This can be verified by using a ¾ inch cone penetrometer and a
  implement should not exceed 2 to 3 mph. At  shovel to test the subsoil for its level of compaction, incrementally, every three inches of
  this slow and managed rate of operating speed,  increasing depth. Once the full thickness of the subsoil’s compacted zone is finally “pieced” and
  maximum functional performance is sustained  there is a significant drop in the psi measurements of the soil penetrometer, the depth/thickness of
  by the tractor and the implement performing the  compaction is determined. This is repeated at several representative locations of the construction
  soil fracturing. Referring to Figure 8, the  site. If the thickness of the site’s subsoil compaction is verified as, for example, ten inches, then
  implement is the 6-leg version of the deep  the Phase 1 Deep Ripping can be correspondingly reduced to the implement’s minimum operable
  angled-leg subsoiler. Its two outside legs are  depth of 12 inches. However, the Phase 2 simultaneous Decompation (subsoiling) of an 11 inch
  “chained up” so that only four legs will be  thick layer of replaced topsoil and the upper subsoil should run at the subsoiling implements full
  engaged (at the maximum depth), requiring no  operating depth.
  less than 160 hp, (rather than 240 hp) of pull.
  The 4-wheel drive, articulated-frame tractor in
  Figure 8 is 174 hp. It will be decompacting this  Fig. 8. A deep, angled-leg subsoiler, ideal for
  unobstructed, former construction access area  Phase 2 decompaction of after the topsoil layer
  simultaneously through 11 inches of replaced  is graded on top of the ripped subsoil.
  topsoil and the upper 12 inches of the
  previously deep-ripped subsoil. In constricted
  areas of Phase 1) Deep Ripping, a medium-size
  tractor with adequate hp, such as the one in
  Figure 9 pulling a 3-shank deep ripper, may be
  more maneuverable.

  Some industrial-grade variations of ripping  Fig. 10. An early pass with a 3-shank deep  Fig. 11. A repeat run of the 3-shank ripper
  implements are attached to power graders and  ripper penetrating only 8 inches into this  along the same patterned pass area as Fig. 9;
  bulldozers. Although highly durable, they are  worksite’s severely compressed subsoil.  here, incrementally reaching 18 of the needed
  generally not recommended. Typically, the  22 inches of subsoil fracture.
  shanks or “teeth” of these rippers are too short
  and stout; and they are mounted too far apart to
  achieve the well-distributed type of lateral and  Fig. 9. This medium tractor is pulling a 3-  Typically, three separate series (patterns) are used for both the Phase 1 Deep Ripping and the
  vertical fracturing of the soil materials  shank deep ripper. The severely compacted  Phase 2 Decompaction on significantly compacted sites. For Phase 1, each series begins with a
  necessary to restore soil permeability and  construction access corridor is narrow, and the  moderate depth of rip and, by repeat-pass, continues until full depth is reached. Phase 2 applies the
  infiltration. In addition, the power graders and  120 hp tractor is more maneuverable for Phase  full depth of Decompation (subsoiling), from the beginning.
  bulldozers, as pullers, are far less maneuverable  1 deep ripping (subsoil fracturing), here.
  for turns and patterns than the tractor.  Every separate series (pattern) consists of parallel, forward-and-return runs, with each progressive

  7  8

Page 307 of 1493