Southtowns Record

Planning Board agenda packet — October 28, 2026

Government
City of Lackawanna
Board
Planning Board
Meeting
Oct 28, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Energy and data center siting, Roads and traffic, Parks and recreation, Public safety, Budget and taxes, Short-term rentals, Housing

Original document

Same meeting

Text · page 105 of 219

Read the whole document on one page (all 219 pages, each with its own heading)

82 OF 148  CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning

  §8-15-7 Permitting Requirements  8.  A one- or three-line electrical diagram
  detailing the entire Solar Energy System
  for Tier 2 Solar Energy  layout, including the number of Solar Panels
  Systems  in each ground-mount array, solar collector
  All Tier 2 Ground-Mounted Solar Energy Systems  installation, associated components,
  shall be permitted in the Enterprise district as an  inverters, electrical interconnection
  accessory structure and shall be subject to site plan  methods, and utility meter, with all National
  approval. Tier 2 Solar Energy Systems shall adhere  Electrical Code compliant disconnects and
  to the standards and requirements established for  over current devices. The diagram should
  Tier 1 Ground-Mounted Systems in Section 8-15-6,  describe the location and layout of all Battery
  in addition to (or in some cases amended by) the  Energy Storage System components if
  following requirements:  applicable and should include applicable
  setback and other bulk and area standards.
  A. Application & Site Plan Review Requirements.
  9.  A preliminary equipment specification sheet
  Applications for Tier 2 Solar Energy Systems,
  that documents all proposed Solar Panels,
  including materials for site plan review, shall
  system components, mounting systems,
  include the following:
  racking system details, and inverters
  1.  Name, address, and contact information  that are to be installed. A final equipment
  of proposed or potential system installer  specification sheet shall be submitted prior
  and the owner and/or operator of the Solar  to the issuance of building permit.
  Energy System. Such information of the final
  B. Standards. Tier 2 Systems shall adhere to the
  system installer shall be submitted prior to
  following standards.
  the issuance of building permit.
  1.  Lot coverage. Tier 2 Solar Energy Systems
  2.  Name, address, contact information, and
  are exempt from the lot coverage
  signature of the project applicant, as well as
  requirements in the underlying zoning
  all the property owners, demonstrating their
  district.
  consent to the application and the use of the
  property for the Solar Energy System.  2.  Screening/Visibility. Tier 2 Solar Energy
  Systems shall have views minimized from
  3.  Nameplate Capacity of the Solar Energy
  adjacent properties to the extent reasonably
  System (as expressed in kW or MW).
  practicable using architectural features,
  4.  Zoning district designation for the parcel(s)  earth berms, landscaping, or other screening
  of land comprising the Facility Area.  methods that will harmonize with the
  5.  Property lines and physical features,  character of the property and surrounding
  including roads, for the project site.  area.
  6.  Adjacent land uses on contiguous parcels  3.  Environmental Resources
  within a certain radius of the site boundary.  a. Tree-cutting. Removal of existing trees
  7.  Proposed changes to the landscape of  larger than 6 inches in diameter should
  the site, including site grading, vegetation  be minimized to the extent possible.
  clearing and planting, the removal of any  b. To the extent practicable, Tier 2 Solar
  large trees, access roads, exterior lighting,  Energy System Owners shall utilize and
  signage, fencing, landscaping, and screening  maintain native perennial vegetation to
  vegetation or structures.  provide foraging habitat for pollinators in
  all appropriate areas within the Facility
  Area.