Text · page 105 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
82 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning §8-15-7 Permitting Requirements 8. A one- or three-line electrical diagram detailing the entire Solar Energy System for Tier 2 Solar Energy layout, including the number of Solar Panels Systems in each ground-mount array, solar collector All Tier 2 Ground-Mounted Solar Energy Systems installation, associated components, shall be permitted in the Enterprise district as an inverters, electrical interconnection accessory structure and shall be subject to site plan methods, and utility meter, with all National approval. Tier 2 Solar Energy Systems shall adhere Electrical Code compliant disconnects and to the standards and requirements established for over current devices. The diagram should Tier 1 Ground-Mounted Systems in Section 8-15-6, describe the location and layout of all Battery in addition to (or in some cases amended by) the Energy Storage System components if following requirements: applicable and should include applicable setback and other bulk and area standards. A. Application & Site Plan Review Requirements. 9. A preliminary equipment specification sheet Applications for Tier 2 Solar Energy Systems, that documents all proposed Solar Panels, including materials for site plan review, shall system components, mounting systems, include the following: racking system details, and inverters 1. Name, address, and contact information that are to be installed. A final equipment of proposed or potential system installer specification sheet shall be submitted prior and the owner and/or operator of the Solar to the issuance of building permit. Energy System. Such information of the final B. Standards. Tier 2 Systems shall adhere to the system installer shall be submitted prior to following standards. the issuance of building permit. 1. Lot coverage. Tier 2 Solar Energy Systems 2. Name, address, contact information, and are exempt from the lot coverage signature of the project applicant, as well as requirements in the underlying zoning all the property owners, demonstrating their district. consent to the application and the use of the property for the Solar Energy System. 2. Screening/Visibility. Tier 2 Solar Energy Systems shall have views minimized from 3. Nameplate Capacity of the Solar Energy adjacent properties to the extent reasonably System (as expressed in kW or MW). practicable using architectural features, 4. Zoning district designation for the parcel(s) earth berms, landscaping, or other screening of land comprising the Facility Area. methods that will harmonize with the 5. Property lines and physical features, character of the property and surrounding including roads, for the project site. area. 6. Adjacent land uses on contiguous parcels 3. Environmental Resources within a certain radius of the site boundary. a. Tree-cutting. Removal of existing trees 7. Proposed changes to the landscape of larger than 6 inches in diameter should the site, including site grading, vegetation be minimized to the extent possible. clearing and planting, the removal of any b. To the extent practicable, Tier 2 Solar large trees, access roads, exterior lighting, Energy System Owners shall utilize and signage, fencing, landscaping, and screening maintain native perennial vegetation to vegetation or structures. provide foraging habitat for pollinators in all appropriate areas within the Facility Area.