Text · page 106 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
PART 8 General Development Standards 83 OF 148 c. Use integrated pest management B. Application & Site Plan Review Requirements. practices to refrain from/limit pesticide Applications for Tier 3 Solar Energy Systems, use (including herbicides) for long-term including materials for site plan review, shall operation and site maintenance. include the following: §8-15-8 Permitting Requirements 1. Name, address, and contact information of proposed or potential system installer for Tier 3 Solar Energy and the owner and/or operator of the Solar Systems Energy System. Such information of the final All Tier 3 Solar Energy Systems are permitted through system installer shall be submitted prior to the issuance of a Special Use Permit within the BRA the issuance of building permit. and Enterprise zoning districts, and subject to site 2. Name, address, contact information, and plan application requirements set forth in this Section. signature of the project applicant, as well as all the property owners, demonstrating their A. Applications for the installation of Tier 3 Solar consent to the application and the use of the Energy System shall be: property for the Solar Energy System. 1. Reviewed by the Zoning Enforcement 3. Nameplate Capacity of the Solar Energy Officer for completeness. Applicants shall be System (as expressed in MW). advised within 30 days of the completeness of their application or any deficiencies that 4. Zoning district designation for the parcel(s) must be addressed prior to substantive of land comprising the Facility Area. review. 5. Property lines and physical features, 2. Subject to a public hearing to hear all including roads, for the project site. comments for and against the application. 6. Map(s) of MSG 1-4 soils and Active This hearing shall be in compliance with Agriculture Lands on the parcel(s) all existing public hearing requirements comprising the Facility Area and adjacent established under law by the City of parcels. Lackawanna. 7. Adjacent land uses on contiguous parcels 3. Referred to the Erie County Department of within a certain radius of the site boundary. Planning pursuant to General Municipal Law 8. Proposed changes to the landscape of § 239-m if required. the site, including site grading, vegetation 4. Upon closing of the public hearing, the clearing and planting, the removal of any Planning and Development Board shall take large trees, access roads, exterior lighting, action on the application within 60-days signage, fencing, landscaping, and screening of the public hearing, which can include vegetation or structures. approval, approval with conditions, or 9. Erosion and sediment control and storm denial. The 60-day period may be extended water management plans prepared to NYS upon consent by both the Planning and Department of Environmental Conservation Development Board and applicant. standards, if applicable, and to such standards as may be established by the Planning Board.