84 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning 10. A one- or three-line electrical diagram d. The provision of a decommissioning detailing the entire Solar Energy System security which shall adhere to the layout, including the number of Solar Panels following requirements: in each ground-mount array, solar collector i. The deposit, executions, or filing installation, associated components, with the City Clerk of cash, bond, or inverters, electrical interconnection other form of security reasonably methods, and utility meter, with all National acceptable to the City attorney and/ Electrical Code compliant disconnects and or engineer, shall be in an amount over current devices. The diagram should sufficient to ensure the good faith describe the location and layout of all Battery performance of the terms and Energy Storage System components if conditions of the permit issued applicable and should include applicable pursuant hereto and to provide for setback and other bulk and area standards. the removal and restorations of the 11. A preliminary equipment specification sheet site subsequent to removal. that documents all proposed Solar Panels, (A) The amount of the bond or system components, mounting systems, security shall be 115% of the cost racking system details, and inverters of removal and site restoration that are to be installed. A final equipment for the Tier 3 Solar Energy specification sheet shall be submitted prior System and shall be revisited to the issuance of building permit. every 5 years and updated as 12. A Property Operation and Maintenance Plan needed to reflect any changes that describes continuing site maintenance, (due to inflation or other cost anticipated dual-use, and property upkeep, changes). The decommissioning such as mowing and trimming. amount shall be reduced by the 13. A Decommissioning Plan signed by the amount of the estimated salvage owner and/or operator of the Solar Energy value of the Solar Energy System. System shall be submitted by the applicant. ii. In the event of default upon The decommissioning plan shall address the performance of such conditions, following: after proper notice and expiration of a. The time required to decommission and any cure periods, the cash deposit, remove the Solar Energy System and any bond, or security shall be forfeited to ancillary structures. the City of Lackawanna, which shall b. The time required to repair any damage be entitled to maintain an action caused to the property by the installation thereon. The cash deposit, bond, or and removal of the Solar Energy System. security shall remain in full force and effect until restoration of the property c. The cost of decommissioning and as set forth in the decommissioning removing the Solar Energy System, as plan is completed. well as all necessary site remediation or restoration.