Text · page 108 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
PART 8 General Development Standards 85 OF 148 C. Special Use Permit Standards. The Planning and 5. Lighting. Lighting of the Solar Energy Development Board may issue a special use Systems shall be limited to that minimally permit for a Tier 3 Solar Energy System only after required for safety and operational purposes it has found that all the following standards and and shall be reasonably shielded and conditions have been satisfied: downcast from abutting properties. 1. Underground Requirements. All utility lines 6. Multiple lots. At the discretion of the located outside of the Facility Area shall be Planning and Development Board, where placed underground to the extent feasible a Tier 3 Solar Energy System’s Facility and as permitted by the serving utility, with Area comprises multiple lots (regardless the exception of the main service connection of ownership by an individual or multiple at the utility company right-of-way and any participating landowners), the combined new interconnection equipment, including lots may be treated a single lot for the without limitation any poles, with new purposes of applying specific standards and easements and right-of-way. requirements. 2. Vehicular Paths. Vehicular paths within the 7. Lot size. The property on which the Tier 3 Facility Area shall be designed in compliance Solar Energy System is placed shall meet with Uniform Code requirements to ensure the lot size requirements of the underlying emergency access, while minimizing the zoning district. extent of impervious materials and soil 8. Setbacks. The Tier 3 Solar Energy compaction. Systems shall have a minimum setback 3. Signage. of 100 feet from all property boundaries. Fencing, collection lines, access roads and a. No signage or graphic content shall be landscaping may occur within the setback. displayed on the Solar Energy Systems except the manufacturer’s name, 9. Height. The Tier 3 Solar Energy Systems shall equipment specification information, have a maximum height of 20 feet to the apex safety information, and 24-hour of the panel at its maximum tilt. emergency contact information. Said a. This height requirement can be waived information shall be depicted within an by the Planning and Development area no more than [8] square feet. Board if the panels are being raised b. As required by National Electric Code to accommodate continued or new (NEC), disconnect and other emergency agricultural purposes. shutoff information shall be clearly 10. Lot coverage. Tier 3 Solar Energy displayed on a light reflective surface. A Systems are exempt from the lot coverage clearly visible warning sign concerning requirements in the underlying zoning voltage shall be placed at the base district. of all pad-mounted transformers and 11. Fencing Requirements. All mechanical substations. equipment, including any structure for 4. Glare. All Solar Panels shall have anti- Battery Energy Storage System components, reflective coating(s). shall be enclosed by a 7-foot-high fence, as required by NEC, with a self-locking gate to prevent unauthorized access.