Text · page 120 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
PART 8 General Development Standards 97 OF 148 J. Certification. The applicant shall provide the K. Monitoring requirements for wind energy following certifications: conversion systems. 1. Certification of structural components. 1. Right to enter premises for monitoring. Upon The foundation, tower and compatibility of reasonable notice, City of Lackawanna the tower with the rotor and rotor-related officials or their designated representatives equipment shall be certified in writing by a may enter a lot on which a WECS facility structural engineer licensed and registered permit has been granted for the purpose of in New York. The engineer shall certify compliance with any permit requirements. compliance with good engineering practices Twenty-four hours' advance notice by and compliance with the appropriate telephone to the owner/operator or provisions of the Uniform Building and designated contact person shall be deemed Construction Code that have been adopted reasonable notice. in New York State. 2. Avian/bat impact study plan. The applicant 2. Certification of post construction. After shall submit a plan for monitoring the avian completion of the wind energy conversion impact of the commercial wind energy system, the applicant shall provide a facility to the Planning Board for its review postconstruction certification from a and approval. Such plan shall document licensed professional engineer licensed and and follow accepted scientific study registered in the State of New York that the procedures. In addition, the applicant shall project complies with applicable codes and agree to submit a report to the Planning industry practices and has been completed Board according to the requirements of the according to the design plans. applicable regulatory agencies that identifies 3. Certification of electrical system. The all dead birds found within 500 feet of the electrical system shall be certified in writing commercial wind energy facility. by an electrical engineer registered in New 3. Periodic reporting required. The applicant York. The engineer shall certify compliance shall agree to submit periodic monitoring with good engineering practices and with the reports to the City. The report shall contain appropriate provisions of the Electric Code data on the operations and environmental that have been adopted by New York State. impacts and shall be in the form prescribed 4. Certification of rotor overspeed control. The by the Code Enforcement Officer. rotor overspeed control system shall be 4. Power production report required. The certified in writing by a mechanical engineer applicant shall agree to submit as requested licensed and registered in New York State. by the City Council a power production The engineer shall certify compliance with report to the City. The power production good engineering practices. report shall include actual power production 5. Certification of project. A certificate of in kilowatt hours for each WECS facility. completion must be supplied by the applicant and approved by the City of Lackawanna Code Enforcement Officer.