96 OF 148  CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning

  2.  Removal and site restoration plan required.  6.  Compliance with FAA regulations. All
  The applicant shall submit a removal and  commercial wind energy siting shall comply
  site restoration plan and removal and site  with Federal Aviation Administration (FAA)
  restoration plan cost estimate to the Code  regulations.
  Enforcement Officer and City Council for  a. Locking mechanisms to limit radar
  review and approval. The restoration plan  interference required. All WECS facilities
  shall identify the specific properties it applies  shall include a locking mechanism which
  to and shall indicate removal of all buildings,  prevents the blades from rotating when
  structures wind turbines, access roads and/or  not producing power, in order to limit
  driveways and foundations to four feet below  airport radar interference or "clutter." This
  finish grade; road repair costs, if any: and all  provision does not apply while the WECS
  regrading and revegetation necessary to return  is "free-wheeling" during startup and
  the subject property to the condition existing  shutdown. The City Council may modify
  prior to establishment of the WECS facility.  or eliminate the requirement for a locking
  The restoration shall reflect the site-specific  mechanism if sufficient evidence is
  character, including topography, vegetation,  presented that no significant airport radar
  drainage, and any unique environmental  interference or "clutter" will be caused by
  features. The plan shall include a certified  the WECS facility.
  estimate of the total cost (by element) of
  implementing the removal and site restoration  I.  Erosion control. The applicant shall adhere to the
  plan.  following:

  3.  Public nuisance. Every unsafe WECS facility  1.  Erosion control plan required. Before the
  and every inoperable WECS facility is hereby  City of Lackawanna shall issue a grading
  declared a public nuisance which shall be  or building permit for the WECS facility, the
  subject to abatement by repair, rehabilitation,  applicant shall submit an erosion control
  demolition, or removal. An inoperable WECS  plan to the Technical Support Department for
  facility shall not be considered a public  review and approval. The plan shall minimize
  nuisance, provided that the owner can  the potential adverse impacts on wetlands
  demonstrate that modernization, rebuilding or  and Class I and II streams and the banks and
  repairs are in progress or planned and will be  vegetation along those streams and wetlands
  completed within no more than six months.  and to minimize erosion or sedimentation.
  4.  "Inoperable" defined. A commercial wind  2.  If the proposed project disturbs over one
  energy facility shall be deemed inoperable if it  acre, the applicant must comply with the
  has not generated power within the preceding  New York State Department of Environmental
  six months.  Conversion SPDES General Permit for
  Stormwater Discharges from Construction
  5.  Interference with residential television,
  Activity (Permit No. GP-02-01). A copy of
  microwave and radio reception. The
  the notice of intent (N.O.I.) and stormwater
  applicant must submit proof that the
  pollution prevention plan (SWPPP), as
  proposed construction of the wind
  required by the general permit, must be
  energy conversion system will not cause
  filed with the City of Lackawanna prior
  interference with microwave transmissions,
  cellular transmissions, residential television  to construction. Per the general permit,
  interference or radio reception of domestic  construction cannot begin until the required
  time period for NYSDEC review has passed.
  or foreign signals. The applicant shall include
  specific measures proposed to prevent
  interference, a complaint procedure, and
  specific measures proposed to mitigate
  interference impacts.