Text · page 119 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
96 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning 2. Removal and site restoration plan required. 6. Compliance with FAA regulations. All The applicant shall submit a removal and commercial wind energy siting shall comply site restoration plan and removal and site with Federal Aviation Administration (FAA) restoration plan cost estimate to the Code regulations. Enforcement Officer and City Council for a. Locking mechanisms to limit radar review and approval. The restoration plan interference required. All WECS facilities shall identify the specific properties it applies shall include a locking mechanism which to and shall indicate removal of all buildings, prevents the blades from rotating when structures wind turbines, access roads and/or not producing power, in order to limit driveways and foundations to four feet below airport radar interference or "clutter." This finish grade; road repair costs, if any: and all provision does not apply while the WECS regrading and revegetation necessary to return is "free-wheeling" during startup and the subject property to the condition existing shutdown. The City Council may modify prior to establishment of the WECS facility. or eliminate the requirement for a locking The restoration shall reflect the site-specific mechanism if sufficient evidence is character, including topography, vegetation, presented that no significant airport radar drainage, and any unique environmental interference or "clutter" will be caused by features. The plan shall include a certified the WECS facility. estimate of the total cost (by element) of implementing the removal and site restoration I. Erosion control. The applicant shall adhere to the plan. following: 3. Public nuisance. Every unsafe WECS facility 1. Erosion control plan required. Before the and every inoperable WECS facility is hereby City of Lackawanna shall issue a grading declared a public nuisance which shall be or building permit for the WECS facility, the subject to abatement by repair, rehabilitation, applicant shall submit an erosion control demolition, or removal. An inoperable WECS plan to the Technical Support Department for facility shall not be considered a public review and approval. The plan shall minimize nuisance, provided that the owner can the potential adverse impacts on wetlands demonstrate that modernization, rebuilding or and Class I and II streams and the banks and repairs are in progress or planned and will be vegetation along those streams and wetlands completed within no more than six months. and to minimize erosion or sedimentation. 4. "Inoperable" defined. A commercial wind 2. If the proposed project disturbs over one energy facility shall be deemed inoperable if it acre, the applicant must comply with the has not generated power within the preceding New York State Department of Environmental six months. Conversion SPDES General Permit for Stormwater Discharges from Construction 5. Interference with residential television, Activity (Permit No. GP-02-01). A copy of microwave and radio reception. The the notice of intent (N.O.I.) and stormwater applicant must submit proof that the pollution prevention plan (SWPPP), as proposed construction of the wind required by the general permit, must be energy conversion system will not cause filed with the City of Lackawanna prior interference with microwave transmissions, cellular transmissions, residential television to construction. Per the general permit, interference or radio reception of domestic construction cannot begin until the required time period for NYSDEC review has passed. or foreign signals. The applicant shall include specific measures proposed to prevent interference, a complaint procedure, and specific measures proposed to mitigate interference impacts.