Text · page 118 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
PART 8 General Development Standards 95 OF 148 3. Noise setbacks. The City Council may impose G. Impact on wildlife species and habitat. The a noise setback that exceeds the other applicant shall adhere to the following regarding setbacks set out in this section if it deems the impact on wildlife species and habitat: that such greater setbacks are necessary to 1. Endangered or threatened species. protect the public health, safety and welfare Development and operation of a WECS of the community. facility shall not have a significant adverse 4. Audible noise standard. The audible noise impact on endangered or threatened fish, standard due to wind turbine operations shall wildlife, or plant species or their critical not be created which causes the noise level habitats, or other significant habitats at the boundary of the proposed project site identified in the City of Lackawanna to exceed the greater of 45 dB(A) for more Comprehensive Plan and/or the studies and than five minutes out of any one-hour time plans of the regional planning commissions period or 6 dB(A) greater than the prevailing based on criteria established by federal or background noise. state regulatory agencies. 5. Operations, low-frequency noise. A WECS 2. Migratory birds. Development and operation facility shall not be operated so that of a commercial wind energy facility shall be impulsive sound below 20 Hz adversely evaluated based on SEQRA findings. affects the habitability or use of any dwelling H. Unsafe and inoperable wind energy facilities; site unit, hospital, school, library, nursing home, reclamation. The applicant shall adhere to the or other sensitive noise receptor. following: 6. Noise complaint and investigation process 1. Removal and site restoration. Unsafe WECS required. The applicant shall submit a noise facilities, inoperable WECS facilities and complaint and investigation process. The WECS facilities for which the permit has Planning Board shall determine the adequacy expired shall be removed by the owner of the noise complaint and investigation at his or her expense. All safety hazards process. created by the installation and operation of F. Fire hazard protection. The applicant shall the commercial wind energy facility shall be submit a fire control and prevention program eliminated, and the site shall be restored to that is appropriate and adequate for the its natural condition to the extent feasible as proposed facility. The proposed program may per Subsection B(11)(b) of this section. A bond include, but is not limited to, the following: or other appropriate form of security shall be 1. Fireproof or fire-resistant building materials. required to cover the cost of the removal and 2. Buffers or fire-retardant landscaping. site restoration at the time of building permit application. The bond shall be payable to 3. iAvailability of water. the City of Lackawanna for the removal 4. An automatic fire-extinguishing system for of nonfunctional towers and appurtenant all buildings or equipment enclosures of facilities in an amount to be determined by substantial size containing control panels, the City for the period of the life of the facility. switching equipment, or transmission Any fund established may consist of a letter equipment without regular human of credit from a State of New York licensed occupancy. financial institution. All costs of the financial 5. Provision of training and fire-fighting security shall be borne by the applicant. equipment for local fire protection personnel.