94 OF 148  CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning

  D. Safety and security requirements. The applicant  7.  Access doors locked. All access doors to
  shall adhere to the following safety and security  wind turbine towers and electrical equipment
  requirements:  shall be lockable and shall remain locked at
  all times when operator personnel are not
  1.  Safety shutdown. Each wind turbine shall be
  present.
  equipped with both manual and automatic
  controls to limit the rotational speed of  8.  Self-supporting structures. All wind energy
  the blade within the design limits of the  conversion system structures shall be of
  rotor. Manual electrical and/or overspeed  monopole construction (single pole). No
  shutdown disconnect switches shall be  lattice structures or guy-wire-supported
  provided and clearly labeled on the wind  structures shall be permitted.
  turbine structure. No wind turbine shall be  9.  Signage. Appropriate warning signage
  permitted that lacks an automatic braking,  shall be placed on wind turbine towers,
  governing, or feathering system to prevent  electrical equipment, and wind energy
  uncontrolled rotation, overspeeding and  facility entrances. Signage shall also include
  excessive pressure on the tower structure,  two twenty-four-hour emergency contact
  rotor blades, and turbine components.  numbers to the owner of the wind turbine
  2.  Grounding. All structures which may be  in accordance with local, state, and federal
  charged with lightning shall be grounded  codes.
  according to applicable electrical codes.  10. Ice throw. The permit shall determine
  3.  Wiring. All wiring between the wind turbines  the acceptable ice throw range based
  and the wind energy facility substation shall  on the activities in the area, location and
  be underground. The applicant is required to  calculations of the ice throw.
  provide a site plan showing the locations of  E. Noise requirements. The applicant shall adhere to
  all overhead and underground electric utility  the following noise requirements:
  lines, including substations for the project.
  1.  Compliance with noise regulations required.
  4.  All transmission lines from wind energy  A WECS permit shall not be granted
  conversion systems to oil-site substations  unless the applicant demonstrates that the
  shall be underground. The City Council shall  proposed project complies with all noise
  have the authority to waive this requirement  regulations.
  if the owner of the property upon which the
  2.  Noise study required. The applicant
  transmission line will be sited consents to
  shall submit a noise study based on the
  aboveground transmission lines or if the
  requirements set out in Subsection B of this
  City Council has sufficient engineering data
  section. The Planning Board and Technical
  submitted by the applicant to demonstrate
  Support Department shall determine
  that underground transmission lines are
  the adequacy of the noise study and, if
  unfeasible.
  necessary, may require further submissions.
  5.  Ground clearance. The blade tip of any  The noise study shall consider the following:
  wind turbine shall, at its lowest point, have a
  a. Low-frequency noise.
  ground clearance of not less than 50 feet.
  b. Infrasound noise.
  6.  Climb ability. Wind turbine towers shall not
  be climbable up to 15 feet above ground level.  c. (Pure tone.
  d. Repetitive/impulsive sound.