Text · page 117 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
94 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning D. Safety and security requirements. The applicant 7. Access doors locked. All access doors to shall adhere to the following safety and security wind turbine towers and electrical equipment requirements: shall be lockable and shall remain locked at all times when operator personnel are not 1. Safety shutdown. Each wind turbine shall be present. equipped with both manual and automatic controls to limit the rotational speed of 8. Self-supporting structures. All wind energy the blade within the design limits of the conversion system structures shall be of rotor. Manual electrical and/or overspeed monopole construction (single pole). No shutdown disconnect switches shall be lattice structures or guy-wire-supported provided and clearly labeled on the wind structures shall be permitted. turbine structure. No wind turbine shall be 9. Signage. Appropriate warning signage permitted that lacks an automatic braking, shall be placed on wind turbine towers, governing, or feathering system to prevent electrical equipment, and wind energy uncontrolled rotation, overspeeding and facility entrances. Signage shall also include excessive pressure on the tower structure, two twenty-four-hour emergency contact rotor blades, and turbine components. numbers to the owner of the wind turbine 2. Grounding. All structures which may be in accordance with local, state, and federal charged with lightning shall be grounded codes. according to applicable electrical codes. 10. Ice throw. The permit shall determine 3. Wiring. All wiring between the wind turbines the acceptable ice throw range based and the wind energy facility substation shall on the activities in the area, location and be underground. The applicant is required to calculations of the ice throw. provide a site plan showing the locations of E. Noise requirements. The applicant shall adhere to all overhead and underground electric utility the following noise requirements: lines, including substations for the project. 1. Compliance with noise regulations required. 4. All transmission lines from wind energy A WECS permit shall not be granted conversion systems to oil-site substations unless the applicant demonstrates that the shall be underground. The City Council shall proposed project complies with all noise have the authority to waive this requirement regulations. if the owner of the property upon which the 2. Noise study required. The applicant transmission line will be sited consents to shall submit a noise study based on the aboveground transmission lines or if the requirements set out in Subsection B of this City Council has sufficient engineering data section. The Planning Board and Technical submitted by the applicant to demonstrate Support Department shall determine that underground transmission lines are the adequacy of the noise study and, if unfeasible. necessary, may require further submissions. 5. Ground clearance. The blade tip of any The noise study shall consider the following: wind turbine shall, at its lowest point, have a a. Low-frequency noise. ground clearance of not less than 50 feet. b. Infrasound noise. 6. Climb ability. Wind turbine towers shall not be climbable up to 15 feet above ground level. c. (Pure tone. d. Repetitive/impulsive sound.