PART 8 General Development Standards  93 OF 148

  q. Other information: such additional  i. Notwithstanding the provisions set forth
  information as may be reasonably  in these subsections, such setbacks from
  requested by the Technical Support  lot lines do not apply if the application
  Department, Code Enforcement Officer,  is accompanied by a legally enforceable
  Planning Board, or City Council.  agreement for a period of 25 years or the
  life of the permit, whichever is longer, that
B. Special use permits issued for wind energy
  the adjacent landowner agrees to the
  conversion systems shall be subject to the
  elimination of the setback.
  following conditions:
  2.  Maximum overall height. The maximum
  1.  Setbacks. The applicant shall adhere to the
  overall height of any wind energy conversion
  following setbacks:
  system shall be 450 feet. The maximum
  a. No commercial wind energy systems shall  height shall be measured from the ground
  be allowed in any residential district.  elevation to the top of the tip of the blade in
  b. One thousand feet from any residential  the vertical position.
  district boundary line.  3.  Signage. No advertising sign shall be placed
  c. A minimum of 1.5 times the total WECS  or painted on any commercial wind energy
  height from any building located outside  facility.
  the applicant's property line.  4.  Color and finish. Wind turbines shall
  d. A minimum of 1,500 feet from any  be painted a nonobtrusive (e.g., light
  dwelling.  environmental color such as white, gray, or
  beige) color that is nonreflective. The design
  e. (From property lines (excluding residential
  of commercial wind energy facility buildings
  zones and the BRA):
  and related structures shall, to the extent
  i.  A minimum of 1.5 times the total  reasonably possible, use materials, colors,
  WECS height from any property line,  textures, screening and landscaping that will
  excluding adjoining lot lines of project  blend the facility to the natural setting and
  participants.  the existing environment.
  f. A minimum of 1.5 times the total WECS  5.  Lighting. The applicant shall submit a
  height from any public road and highway.  commercial wind energy facility lighting
  plan that describes all lighting that will be
  g. Where the lot line abuts a public right-
  required, including any lighting that may be
  of-way, the setbacks specified above shall
  required by the FAA. Such plan shall include
  be measured from the center line of such
  but is not limited to the planned number and
  right-of-way.
  location of lights, light color, whether any
  h. From aboveground transmission lines  such lights will be flashing, and mitigation
  greater than 12 kilovolts:  measures planned to control the light so
  i.  A minimum of 1.5 times the total  that it is does not spill over onto neighboring
  WECS height from any aboveground  properties.
  transmission line greater than  C. Compliance with regulatory agencies. The
  12 kilovolts, excluding where  applicant is required to obtain all necessary
  transmission lines are located within  regulatory approvals and permits from all
  PUD Zones and those transmission  federal, state, county, and local agencies
  lines associated with the WECS and  having jurisdiction and approval related to
  in the BRA.  the completion of the wind energy conversion
  system.