Southtowns Record

Planning Board agenda packet — October 28, 2026

Government
City of Lackawanna
Board
Planning Board
Meeting
Oct 28, 2026
Kind
Agenda packet
Topics
Zoning and land use, Water, sewer and drainage, Energy and data center siting, Roads and traffic, Parks and recreation, Public safety, Budget and taxes, Short-term rentals, Housing

Original document

Same meeting

Text · page 115 of 219

Read the whole document on one page (all 219 pages, each with its own heading)

92 OF 148  CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning

  iv. A description and map showing the  j. Ice throw calculations: a report from a
  potential noise impacts, including  New York State professional engineer
  estimates of expected noise impacts  that calculates the maximum distance
  upon construction and operation  that ice from the turbine blades could he
  workers and estimates of expected  thrown. The basis of the calculation and
  noise levels at sensitive receptor  all assumptions must be disclosed.
  locations.  k. Blade throw calculations: a report from
  v.  A description and map of the  a New York State professional engineer
  cumulative noise impacts.  that calculates the maximum distance
  vi. A description of the project's  that pieces of the turbine blades could be
  proposed noise-control features,  thrown. The basis of the calculation and
  including specific measures  all assumptions must be disclosed.
  proposed to protect workers and  l. Catastrophic tower failure: a report from
  specific measures proposed to  the turbine manufacturer stating the wind
  mitigate noise impacts for sensitive  speed and conditions that the turbine
  receptors consistent with levels in  is designed to withstand, including all
  this article.  assumptions.
  vii. Identification of any problem areas.  m. FAA notification: a copy of written
  viii. Manufacturers' noise design and field  notification to the Federal Aviation
  testing data, both audible dB(A) and  Administration.
  low frequency (deep bass vibration),  n. (Utility notification: utility interconnection
  for all proposed structures.  data and a copy of a written notification
  ix. A report that out lines issues and  to the utility of the proposed
  considerations for individuals that use  interconnection.
  hearing aids.  o. (Notification to microwave
  communications link operators. An
  i. A geotechnical report shall be furnished
  application that includes any wind turbine
  which shall, at a minimum, include the
  which is located within two miles of any
  following:
  microwave communications link shall
  i.  Soils engineering and engineering  be accompanied by a copy of a written
  geologic characteristics of the site  notification to the operator of the link.
  based on oil-site sampling and  p. Floodplain. An application that includes
  testing.  any wind turbine which is located within
  ii.  Foundation design criteria for all  a one-hundred-year floodplain area, as
  proposed structures.  such flood hazard areas are shown on the
  iii. Slope stability analysis.  floodplain maps, shall be accompanied by
  a detailed report which shall address the
  iv. Grading criteria for ground
  potential for wind erosion, water erosion,
  preparation, cuts and fills, and soil
  sedimentation and flooding, and which
  compaction.
  shall propose mitigation measures for
  such impacts.