Text · page 136 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 113 OF 148 Critical Facilities. even though the lower area is enclosed by means of breakaway walls that meet the 1. Structures or facilities that produce, use or federal standards. store highly volatile, flammable, explosive, toxic and/or water-reactive materials; Federal Emergency Management Agency.The 2. Hospitals, nursing homes, and housing federal agency that administers the National Flood likely to contain occupants who may not be Insurance Program. sufficiently mobile to avoid death or injury Flood Boundary And Floodway Map (Fbfm). during a flood; An official map of the community published by the 3. Police stations, fire stations, vehicle and Federal Emergency Management Agency as part equipment storage facilities, and emergency of a riverine community's Flood Insurance Study. operations centers that are needed for flood The FBFM delineates a regulatory floodway along response activities before, during, and after a watercourses studied in detail in the Flood Insurance flood; and Study. 4. Public and private utility facilities that are Flood Elevation Study. An examination, evaluation vital to maintaining or restoring normal and determination of the flood hazards and, if services to flooded areas before, during and appropriate, corresponding water surface elevations, after a flood. or an examination, evaluation and determination of Development. Any man-made change to improved flood-related erosion hazards. or unimproved real estate, including but not limited to Flood Hazard Boundary Map (FHBM). An buildings or other structures, mining, dredging, filling, official map of a community, issued by the Federal paving, excavation or drilling operations or storage of Emergency Management Agency, where the equipment or materials. boundaries of the areas of special flood hazard have Elevated Building. A non-basement building: been designated as Zone A but no flood elevations are provided. 1. Built, in the case of a building in Zones A1-A30, AE, A, A99, AO, AH, B, C, X, or D, to Flood Insurance Rate Map (Firm). An official map have the top of the elevated floor, or in the of a community, on which the Federal Emergency case of a building in Zones V1-30, VE, or V, Management Agency has delineated both the areas to have the bottom of the lowest horizontal of special flood hazard and the risk premium zones structural member of the elevated floor, applicable to the community. elevated above the ground level by means of Flood Insurance Study. See "flood elevation study." pilings, columns (posts and piers), or shear walls parallel to the flow of the water; and , Flood or Flooding. 2. Adequately anchored so as not to impair 1. A general and temporary condition of partial the structural integrity of the building during or complete inundation of normally dry land a flood of up to the magnitude of the base areas from: flood. In the case of Zones A1-A30, AE, A, A99, AO, AH, B, C, X, or D, "elevated building" a. The overflow of inland or tidal waters; also includes a building elevated by means b. The unusual and rapid accumulation or of fill or solid foundation perimeter walls runoff of surface waters from any source. with openings sufficient to facilitate the unimpeded movement of floodwaters. In the case of Zones V1-V30, VE, or V, "elevated building" also includes a building otherwise meeting the definition of "elevated building,"