66 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning in writing. In order to be approved, an applicant d. Construction phasing plan describing shall revise a SWPPP that has been approved the intended sequence of construction with modifications or disapproved in accordance activities, including clearing and with the recommendations of the SMO and shall grubbing, excavation and grading, utility submit the revised SWPPP to the SMO for review. and infrastructure installation and any other activity at the site that results in soil §7-12-5 Stormwater Pollution disturbance. Consistent with the Erosion Prevention Plans Control Manual, not more than five acres shall be disturbed at any one time unless A. Stormwater pollution prevention plan pursuant to an approved SWPPP; requirement. No application for approval of a land development activity shall be reviewed and no e. Description of the pollution prevention land development activity shall be commenced measures that will be used to control until the SMO or such employee, officer or board litter, construction chemicals and of the City which may be reviewing an application construction debris from becoming a for approval of a land development activity pollutant source in stormwater runoff; requiring submission of a SWPPP has received f. Description of construction and waste a SWPPP the complies with the specifications in materials expected to be stored on this article and has approved such SWPPP. site with updates as appropriate, and B. Contents of stormwater pollution prevention a description of controls to reduce plans. pollutants from these materials including storage practices to minimize exposure of 1. All SWPPPs shall provide the following the materials to stormwater, and spill- background information and erosion and prevention and response; sediment controls: g. Temporary and permanent structural and a. Background information about the scope vegetative measures to be used for soil of the project, including the location, type stabilization, runoff control and sediment and size of the project; control for each stage of the project, b. (Site map/construction drawing(s) for from initial land clearing and grubbing to the project, including a general location project close-out; map. The site map should be at a scale h. A site map/construction drawing(s) of no smaller than one inch to 100 feet. specifying the location(s), size(s) and At a minimum, the site map should show length(s) of each erosion and sediment the total site area; all improvements; control practice; areas of disturbance; areas that will not be disturbed; existing vegetation; i. Dimensions, material specifications and on-site and adjacent off-site surface installation details for all erosion and water(s); wetlands and drainage patterns sediment control practices, including that could be affected by the land the siting and sizing of any temporary development activity; existing and final sediment basins; slopes; locations of off-site material, j. Temporary practices that will be waste, borrow or equipment storage converted to permanent control areas; and location(s) of the stormwater measures; discharges(s); k. Implementation schedule for staging c. Description of the soil(s) present at the temporary erosion and sediment control site; practices, including the timing of initial placement and duration that each practice should remain in place;