Text · page 90 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
PART 7 General Development Standards 67 OF 148 l. Maintenance schedule to ensure b. Description of each postconstruction continuous and effective operation of the stormwater management practice; erosion and sediment control practice; c. Site map/construction drawing(s) m. Name(s) of the receiving water(s); showing the specific location(s) and n. Delineation of SWPPP implementation size(s) of each postconstruction responsibilities for each part of the site; stormwater management practice; o. Description of structural practices d. Hydrologic and hydraulic analysis for all designed to divert flows from exposed structural components of the stormwater soils, store flows, or otherwise limit runoff management system for the applicable and the discharge of pollutants from design storms; exposed areas of the site to the degree e. Comparison of post development attainable; and stormwater runoff conditions with p. Any existing data that describes the predevelopment conditions; stormwater runoff at the site. f. Dimensions, material specifications and installation details for each 2. Land development activities meeting postconstruction stormwater Condition A, B or C below shall also include management practice; water quantity and water quality controls (postconstruction stormwater runoff controls) g. Maintenance schedule to ensure as set forth in § 230-94B(3) of this article as continuous and effective operation applicable: of each postconstruction stormwater management practice; a. Condition A: stormwater runoff from land development activity discharging a h. Maintenance easements to ensure access pollutant of concern to either an impaired to all stormwater management practices water identified on DEC's 303(d) list of at the site for the purpose of inspection impaired waters or a total maximum daily and repair. Easements shall be recorded load (TMDL) designated watershed for on the plan and shall remain in effect with which pollutants in stormwater have been transfer of title to the property; identified as a source of the impairment. i. Inspection and maintenance agreement b. Condition B: stormwater runoff from land binding on all subsequent landowners development activity disturbing five or served by the on-site stormwater more acres. management measures in accordance with § 230-96 of this article; and, c. Condition C: stormwater runoff from land development activity disturbing between j. For any land development activity one and five acres of land during the meeting Condition A in § 230-94B(2), the course of the project, exclusive of the SWPPP shall be prepared by a licensed construction of single-family residences professional and must be signed by the and construction activities at agricultural professional preparing the plan, who shall properties. certify that the design of all stormwater management practices meets the 3. SWPPP requirements for Conditions A, B requirements in this article. or C (postconstruction stormwater runoff controls): a. All information in § 230-94B(1) of this article;