Text · page 92 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
PART 7 General Development Standards 69 OF 148 B. Maintenance easement(s). Prior to the chapter entitled "Sample Stormwater Control issuance of any approval that has a stormwater Facility Maintenance Agreement. The City, management facility as one of the requirements, in lieu of a maintenance agreement, at its the applicant or developer must execute a sole discretion, may accept dedication of any maintenance easement agreement that shall be existing or future stormwater management binding on all subsequent landowners served facility, provided such facility meets all the by the stormwater management facility. The requirements of this article and includes easement shall provide for access to the facility adequate and perpetual access and at reasonable times for periodic inspection by sufficient area, by easement or otherwise, for the City to ensure that the facility is maintained inspection and regular maintenance. in proper working condition to meet design standards and any other provisions established §7-12-8 Administration and by this article. The easement shall be recorded by Enforcement; Penalties for the grantor in the office of the County Clerk after Offenses; Fees approval by the counsel for the City. A. Construction inspection. C. Maintenance after construction. The owner or 1. Erosion and sediment control inspection. operator of permanent stormwater management practices installed in accordance with this article a. The SMO may require such inspections shall ensure they are operated and maintained to as necessary to determine compliance achieve the goals of this article. Proper operation with this article and may either approve and maintenance also includes, as a minimum, that portion of the work completed or the following: notify the applicant wherein the work fails to comply with the requirements of 1. A preventive/corrective maintenance this article and the SWPPP as approved. program for all critical facilities and To obtain inspections, the applicant shall systems of treatment and control (or related notify the SMO at least 48 hours before appurtenances) which are installed or used any of the following, as required by the by the owner or operator to achieve the goals SMO: of this article. i. Start of construction; 2. Written procedures for operation and maintenance and training new maintenance ii. iInstallation of sediment and erosion personnel. control measures; 3. Discharges from the SMPs shall not exceed iii. Completion of site clearing; design criteria or cause or contribute iv. Completion of rough grading; to water quality standard violations in v. Completion of final grading; accordance with § 230-95 of this article. vi. Close of the construction season; 4. Maintenance agreements. The City shall approve a formal maintenance agreement vii. Completion of final landscaping; or for stormwater management facilities viii. Successful establishment of binding on all subsequent landowners and landscaping in public areas. recorded in the office of the County Clerk as a deed restriction on the property prior to final plan approval. The maintenance agreement shall be consistent with the terms and conditions of Appendix A of this